Site work and paving for a mixed-use development in Auburn Hills, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 107, 2024, project was awarded to Best Asphalt, awarded amount is $2,837,903.15.** Description: Approximately three-quarters of a mile of 3.5" HMA mill and resurface with curb ramp replacement and intermittent curb / drainage structure repair, three-quarters of a mile of crush and shape with 5" HMA overlay and driveway replacements, and 800 feet of road reconstruction with 8" of HMA and concrete curb and gutter / driveways. Additional Description: Bid Security in the form of a Cashier's Check or Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid. The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids. No Bid may be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of the Bids. Neither Owner nor ENGINEER will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidders should direct correspondence to the ENGINEER. Location Details Site Address: 1827 North Squirrel Road City: Auburn Hills County: Oakland State/Province: MI No pre-bid meetings are scheduled for this project. SCOPE OF PROJECT The work to be done under this Contract includes the furnishing of all materials, equipment, and labor necessary to construct the proposed utilities, roads, pathways, sidewalks, and driveways as well as all necessary earthwork, cleaning, and restoration in accordance with the plans and specifications. Summary of anticipated dates: Contract Award, Perry Walton and Hunt Club May 6, 2024 Tentative Contract Award, Superior Court May 6, 2024 Contract Award, Superior Court May 20, 2024 Notice to Proceed, Perry Walton and Hunt Club May 15, 2024 Notice to Proceed, Superior Court May 22, 2024 Construction Start DateMay 28, 2024 Substantial Completion Date August 30, 2024 Project CompletionNovember 15, 2024

Award

Roads / Highways

$2,837,903.00

Public - City

Paving, Site Work

58

7

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
74
Bidding Soon
1,364
All Active Projects
542
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

June 17, 2024

img_map_placeholder

1827 N Squirrel Rd, Auburn Hills, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.