Site work and new construction of a transportation facility in Seattle, Washington. Completed plans call for the construction of a transportation facility.

Hoffman Construction Company of Washington has been selected as the Construction Manager/General Contractor ("GC/CM" or "Contractor") for the Port of Seattle Post IAF Airline Realignment Project ("Project") being performed for Port of Seattle ("Owner"). We invite you to submit a Sub-bid proposal and/or Material Quotation in your area of expertise and in accordance with the terms of this Request for Proposals ("RFP"). We are an equal opportunity employer and request bids from all interested firms including disadvantaged, minority, women, disabled veterans and emerging small business enterprises. As used herein, the terms "Bidder" and "Proposer" are synonymous and shall mean the firm responding to this RFP. As used herein, the terms "bid" and "proposal" are synonymous and shall mean the response to this RFP. Please park in general parking (floors 3,5-8), at the very south end of the airport garage, near the yellow or green elevators or rows N-U. From the airport garage: Take the elevator to the fourth floor of the garage and walk across skybridge 1 to the main terminal. (The Link light rail Sea-Tac Airport station is connected to the fourth floor of the garage. Take the escalator or elevator to the ticketing level. You will find the stairs and elevator to The Conference Center directly behind the international ticket counters to the mezzanine level. Our reception area is at the top of the stairs, through the double glass doors on your left. Attendees must bring/wear their own OSHA-compliant helmet and safety glasses, reflective vest, long pants and boots in order to attend the job walk following the pre-bid meeting. All bidders are encouraged to attend the pre-bid meeting in order to acquaint themselves with the local conditions under which the work is to be performed and to correlate personal observations with the requirements of the Contract Documents. Statements made at this meeting and site visit by representatives of the Contractor, Owner, Architect, Engineers, and/or others are not binding and do not change the RFP documents or bidding requirements unless such statements are confirmed by written Addendum to the RFP. DIVERSE BUSINESS PARTICIPATION AND INCLUSION PLAN: Owner and Contractor are committed to promoting and stimulating the growth of disadvantaged business enterprises, minority business enterprises, women business enterprises and veteran owned businesses and maximizing opportunities for these firms to participate in the work of this project. Subcontractor shall endeavor to utilize such firms through sub-tier contracting and/or material purchases and shall provide documentation of their good faith efforts and achievements. Project goal is 13%WMBE inclusion, however, Contractor has established a scope specific goal for each of the following items: 20% - Selective Demolition, Wall Assemblies & Ceilings, Architectural Sheetmetal, Painting & Coatings, Lockers, Civil Work 18% - Finish Carpentry/Casework, Doors, Frames & Hardware, Signage, Window Treatments 15% - Concrete, Masonry, Steel & Caged Storage, Roofing, Tiling & Flooring & Underlayment 13% - Windows & Glazing, Plastic Matrix Terrazzo, Baggage Conveyor A BID BOND in the form of a surety bond, cashier's check or certified check in an amount equal to five percent (5%) of the bid must be attached to bids in excess of three hundred thousand dollars ($300,000). BID BOND shall be payable to Hoffman Construction Company of Washington. Bond may be emailed providing the original Bid Bond is delivered no later than the next business day. Failure to provide BID BOND with bid shall render bid non-responsive. All bids must be submitted pursuant to the instructions below. It is the Subcontractor's/Vendor's sole responsibility to ensure that the bid is delivered in the manner required by the RFP by the due date and time. GC/CM has the right to reject and bid not properly delivered. Technical questions and substitution requests should be SUBMITTED IN WRITING (No Telephone Calls, please!) at least nine (9) working days prior to the bid date to: Brad Cooper, E-mail: Brad-Cooper@Hoffmancorp.com

Post-Bid

Transportation Terminals

$45,000,000.00

Public - County

New Construction, Site Work

1015

48

43

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
48
Bidding Soon
859
All Active Projects
320
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 21, 2024

img_map_placeholder

17801 International Blvd, Seattle, WA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.