BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2024 at 8:00 PM

Updated May 15, 2024

Site work and paving for a road / highway in Broken Arrow, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project includes pavement reconstruction and widening of the 37th Street corridor from Kenosha Street to Albany Street. The new asphalt configuration will include one through lane in each direction with a two-way-left-turn lane. The proposed project includes approximately 3,950 linear feet of concrete sidewalk, approximately 2,900 linear feet of Rural Water District waterline, approximately 2,875 linear feet of curb and gutter, storm drainage improvements, and other miscellaneous items. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price. The acceptance and award of this Bid will be considered by the Broken Arrow City Council. The City of Broken Arrow reserves the right to reject any or all Bids. Project will be awarded to the responsible Bidder with the lowest base bid or lowest combined base and additive alternate bids, if any, which is most advantageous to City of Broken Arrow. Applicable additive alternates, if any, will be determined at the City of Broken Arrow's discretion. The lowest responsible Bidder will be notified within ten (10) working days of the Bid opening as to when this Public Construction Contract will be placed on the Broken Arrow City Council Agenda for consideration. Contract time for the project shall be Three Hundred (300) calendar days. For questions, please contact the Engineering & Construction Department by email at engineering.construction@brokenarrowok.gov or by phone at (918)259-7000 x5414.

Award

Roads / Highways

$4,087,474.00

Public - City

Paving, Site Work

91

7

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
74
Bidding Soon
951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

July 1, 2024

Project location map

N 37th St, Broken Arrow, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.