BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2024 at 8:00 PM

Updated July 26, 2024

Site work and outdoor lighting for a civil project in Goodyear, Arizona. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

202 MA 001 F062101C 202-A-(209)T RED MOUNTAIN FREEWAY (SR-202) (24TH ST - SCOTTSDALE RD) Central District Item # 103708 Engineering Specialist: Jalal Kamal Pre-Qualification: YES Bid Opening: 6/7/2024 11:00:00 AM The proposed project is located in Maricopa County on SR-202L starting at MP 0.80 and extending east to MP 7.80. The work consists of replacing existing high-pressure sodium (HPS) luminaires with new Light Emitting Diode (LED) fixtures and other related work. AZDOT - Convert HPS to Led Lighting - SR-202L Maintenance of Traffic: of the Standard Specifications is modified to add: In order to eliminate the possibility of causing or exacerbating air quality violations resulting from construction activities, any traffic control plans which include temporary traffic detours involving local adjacent streets or alternate routes must be approved by the Engineer. Prevention of Air and Noise Pollution: of the Standard Specifications is modified to add: In the event that the Governor declares an air pollution emergency, pursuant to ARS 49 which restricts work schedules for all employees of the state and its political subdivisions, the Engineer will direct the contractor suspend all work activities until further notice. The contractor shall discontinue all current work activities as soon as possible, but not later than four hours after notification by the Engineer. The contractor will be compensated for labor costs incurred through the end of the work shift in which the notification occurs. No payment adjustments will be made for equipment or overhead costs resulting from the suspension of work. An extension of the time allowable under the contract will be granted in accordance with Subsection 108.08 of these specifications. In the event that any local air quality authority declares an air pollution advisory, the cooperation of the contractor is requested in complying with the actions recommended by the local authority to the maximum extent possible

Award

Roads / Highways

$537,640.00

Public - State/Provincial

Outdoor Lighting, Site Work

23

3

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
14
Bidding Soon
1,207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

August 6, 2024

Project location map

SR-202L, Goodyear, AZ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.