BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Pendleton, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

NW Despain Avenue Reconstruction All bidders must be prequalified and all pre qualifications must be submitted to the City by 1:00 pm the day before the bid opening. Work to be performed shall include the removal and replacement of approximately 2,670 LF of City standard curb and gutter, 559 SY of sidewalk and driveway approaches, 1,200 tons of asphalt, 2,160 LF of water main, 780 LF of storm drain pipe, catch basins, manholes, and other associated work. The HMAC for this Project shall be 1/2-inch Dense Level 3 with PG 64-28 grade oil. HMAC shall be placed in 2 - 2-inch lifts for reconstructions. 1. Remove and reconstruct curb, gutter, sidewalks, driveway approaches, driveways, walkways, and construct ADA ramps as called for in the plans. 2. Install catch basins and storm pipe as called for in the plans. 3. Install water main. 4. Road reconstruction. 5. Adjust water meter boxes and catch basins. 6. Perform additional and incidental work as called for in the Specifications and Plans

Award

Roads / Highways

$1,138,395.00

Public - City

Paving, Site Work

16

5

4

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
21
Bidding Soon
302
All Active Projects
101
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

June 24, 2024

img_map_placeholder

NW Despain Ave, Pendleton, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.