Renovation of a residential development in Ottawa, Ontario. Completed plans call for the renovation of a residential development.

Reference Number 0000267809 Pricing Lump sum The Scope of Work generally includes the front pre-cast concrete step replacement, railings, and associated work at various Ottawa Community Housing communities. The scope of work generally includes, but is not limited to the following: 1. Remove and dispose existing pre-cast steps or steps cantilevered to foundation and railings. Remove any foundation anchor of railings anchored to the steps without damaging the foundation walls. 2. Removal and disposal of the existing pathway section that gives access to the unit (asphalt, concrete, interlock, or unit pavers) to set up a new base for new steps; 3. Seal any openings in foundation after removal of existing steps with Polyurethane Waterproof Concrete Sealant; 4. Review with Project Manager and replace the kick plate under the door sill, if damaged, with new wood block, 5/8" plywood, seal, and new prefinished metal kick plate, colour white; 5. Regrade away from foundation, and install new compacted base material, and patio stone layout to receive new front steps and accessories as per drawings and specifications; 6. Measure correct heights to match OBC requirements for household egress, to adjust landing heights. 7. Installation of New Pre-cast Front Steps, to Match Existing Width, With Exposed Aggregate Finish, and Painted Railings; Number of Raisers May Vary Based on New Measurements. 8. Single Step Adjusting Involves Removing Temporarily Existing Steps, Re-grading Existing Soil, Incorporate New Aggregate, Re-lay the Patio Stones, and Re-install Existing Steps; 9. Light Asphalt Work Involves the Installation of New Aggregate Base, and Asphalt Pathway or Paving Section Giving Access to the Unit, Flash and Level to the Front of New Steps, or in All Sides as Existing; 10. Install New Double or Single Railings as Indicated and Required on Existing Units; 11. Table With Unit Address and Details for Front Steps Replacement, and Railing Install, is Included in Schedule H; 12. Complete the Pathway Access Paving Repairs and All Reinstatement of Landscaping; 13. Provide Traffic and Pedestrian Control During Construction; Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Residential Subdivision

$351,375.00

Public - City

Renovation

3

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
35
Bidding Soon
624
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 27, 2024

img_map_placeholder

Multiple Locations, Ottawa, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.