BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Calexico, California. Contact the soliciting agency for additional information.

The City of Calexico ("City") is requesting proposals from qualified engineering professionals to provide engineering design services for Chlorine Conversion Project - Gaseous Chlorine Feed System to Liquid Hypochlorite Feed System. The City proposes to convert from a gaseous chorine system to a 12.5% bulk sodium hypochlorite disinfection system. The City owns and operates a Water Treatment Plant ("WTP") and Eastside Water Reservoir ("EWR"). The WTP receives its water supply from the Colorado River through the Imperial Irrigation District's ("IID") canal. The City's WTP has a design capacity of 14 Million Gallon per Day ("MGD"), with an average daily demand of 9 MGD and current peak flow of 7-8 MGD. The EWR has a design capacity of 6 MGD, with an average daily demand of 1.25 MGD. Both the WTP and EWR currently operate on gaseous chlorine water disinfection system to disinfect the water prior to discharging it into the City's supply lines. The City has concerns regarding the usage of chlorine gas as a disinfectant, as chlorine gas is toxic and poses dangers to the public and operations staff. The WTP is located adjacent to residential and commercial areas, schools and the Calexico International Border and the EWR is located adjacent to residential area. Both facilities pose a significant high risk of chlorine gas exposure to the public. The contract will be regulated according to the provisions of all federal, state and local laws and ordinances that are applicable. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1774. All Service Providers and sub-consultant(s) shall pay all workers not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available on the Internet. All Service Providers and sub-consultant(s) shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. Consultant must submit five (5) copies of their proposal with original Consultant signature. The proposal must be formatted in accordance with the instructions of this RFP. Promotional material may be attached, but are not necessary and will not be considered as meeting any of the requirements of this RFP. Late, emailed or facsimile proposals will not be accepted. It is the proposer's responsibility to assure that its proposal is delivered and received at the location specified herein, on or before the date and hour set. Proposals received after the date and time specified will not be considered. Consultant will be required to obtain a City of Calexico Business License once proposal is awarded. If you have any questions or require additional information, please do not hesitate to contact the Public Works Department at 760/768-2160.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
92
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

img_map_placeholder

Multiple Locations, Calexico, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.