BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 14, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Elberfeld, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Title: Warrick County Br 37 Rehabilitation P.E. and Right of Way Services (Des # 2301607) in the Vincennes District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Robert Howard, P.E. County Engineer 555 Roth Road Boonville, Indiana, 47601 812-897-6126 Bhoward@warrickcounty.gov Local Public Agency: Warrick County Project Location: Br 37 over Pigeon Creek on Wabash & Erie Canal Project Description: Warrick County Bridge #37 carries Stanley Road over Wabash & Erie Canal. The proposed scope of work is for this structure is as follows: Remove existing surface through surface milling and hydro demolition Perform full depth patching as required. Install an alternate bid 1 latex modified or silica fume modified rigid deck overlay Clean and paint steel beams and bearings. Extend deck drains to be below bottom beam flange. Replace expansion joints. Install scour countermeasures around piers as required from scour analysis. Replace deteriorated bearings at Pier #2 & #8 under toothed expansion joints. Patch any spalled areas on deck and substructure. Surface seal bridge rail and copings. Transition mill and overlay approach pavement to tie into 1 grade raise from rigid overlay. Replace approach guardrail as needed Maintenance of traffic will utilize a detour on CR 1050 W, 7 Hills Road/CR 750 N, and Lily Pad Road. A CE-1 is anticipated. An IDNR CIF Permit, USACE 404 Nationwide Permit, and IDEM 401 Nationwide Permit are anticipated. INDOT Des #: 2301607 Phases Included: PE & RW Estimated Construction Amount: $1,600,000 Funding: 80/20 Term of Contract: Until Project Complete DBE goal: 3% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Warrick County Br 37 Rehabilitation P.E. and Right of Way Services

Conceptual

Bridges / Tunnels

$1,600,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
9
Bidding Soon
644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

Project location map

Stanley Rd, Elberfeld, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.