Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2024 at 8:00 PM
Updated April 14, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Elberfeld, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Title: Warrick County Br 37 Rehabilitation P.E. and Right of Way Services (Des # 2301607) in the Vincennes District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Robert Howard, P.E. County Engineer 555 Roth Road Boonville, Indiana, 47601 812-897-6126 Bhoward@warrickcounty.gov Local Public Agency: Warrick County Project Location: Br 37 over Pigeon Creek on Wabash & Erie Canal Project Description: Warrick County Bridge #37 carries Stanley Road over Wabash & Erie Canal. The proposed scope of work is for this structure is as follows: Remove existing surface through surface milling and hydro demolition Perform full depth patching as required. Install an alternate bid 1 latex modified or silica fume modified rigid deck overlay Clean and paint steel beams and bearings. Extend deck drains to be below bottom beam flange. Replace expansion joints. Install scour countermeasures around piers as required from scour analysis. Replace deteriorated bearings at Pier #2 & #8 under toothed expansion joints. Patch any spalled areas on deck and substructure. Surface seal bridge rail and copings. Transition mill and overlay approach pavement to tie into 1 grade raise from rigid overlay. Replace approach guardrail as needed Maintenance of traffic will utilize a detour on CR 1050 W, 7 Hills Road/CR 750 N, and Lily Pad Road. A CE-1 is anticipated. An IDNR CIF Permit, USACE 404 Nationwide Permit, and IDEM 401 Nationwide Permit are anticipated. INDOT Des #: 2301607 Phases Included: PE & RW Estimated Construction Amount: $1,600,000 Funding: 80/20 Term of Contract: Until Project Complete DBE goal: 3% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Warrick County Br 37 Rehabilitation P.E. and Right of Way Services
Conceptual
Bridges / Tunnels
$1,600,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
