Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 18, 2025 at 8:00 PM
Updated April 19, 2025
Site work and paving for a mixed-use development in Morrisville, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
https://www.bizjournals.com/triangle/news/2025/04/17/rdu-international-runway-repairs-cost-construction.html Raleigh-Durham International Airport is spending millions to maintain its longest runway until a new one is built. The 10,000-foot runway, labeled 5L/23R, is used for long-haul flights and is critical for service to Germany, the West Coast and other faraway destinations as RDU continues to expand its reach. But its upkeep is expensive. On Thursday, the Raleigh-Durham Airport Authority Board approved a preservation construction contract worth $7 million for Balfour Beatty Construction. It's the sixth "session" of the contract that's meant to extend the life of the runway. And it likely won't be the last. The airport is running about $7 million a year to keep the runway going, RDU Chief Development Officer Bill Sandifer told the board. The runway preservation project started in 2019. By the time the new runway broke ground in 2023, the airport had already spent $30 million to keep the current airstrip open. The new runway is cleared to be up to 10,639 feet long, which will allow larger planes to serve RDU. "Without that runway, your transatlantic service is lost, your West Coast service is lost," airport CEO Michael Landguth said in 2023. And when you lose service, "it's almost impossible to get it back." The new runway, which will cost more than $1 billion to build, is a key part of RDU's $2.5 billion spending plan, which also includes terminal expansion and improvements to John Brantley Boulevard among other projects. Airport officials have said federal dollars will be essential to the capital plan. This year through March, more than 1.6 million people have boarded planes at RDU (a 2.2 percent increase over last year), including nearly 66,000 bound for international destinations. That's nearly 50 percent more than last year's international flyers through the first three months of the year. ________________________________________________________________________________________________________________________________________ Amendment 0005 posted on 24 February 2025 See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0005" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states: The purpose of Amendment 0005 is as follows: 1) The close date of the proposal is changed from 02/28/2025 at 1700 CT to 03/14/2025 at 1700 CT. 2) Removal of Uniform Bipartisan Infrastructure Law Report 3) Removal of clauses that are no longer applicable 4) Incorporate Presidential Executive Orders in Section H 5) All other terms and conditions remain unchanged and in full force and effect. All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive. Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). Amendment 0003 posted on 15 January 2025 See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states: The purpose of Amendment 0003 is as follows: 1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025. 2) All other terms and conditions remain unchanged and in full force and effect. All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive. Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). Amendment 0002 posted on 26 December 2024 See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states: The purpose of Amendment 0002 is as follows: 1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025. 2) All other terms and conditions remain unchanged and in full force and effect. All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive. Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC. It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M. Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals. This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law - Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled "Uniform Bipartisan Infrastructure Law (BIL) Data Report" are available in the attachments of this announcement. All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals. Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible. Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Post-Bid
Sidewalks / Parking Lot
$750,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2025
April 21, 2025
1000 Sawyer Cir, Morrisville, NC
Related To This Project
Morrisville, NC
--
Morrisville, NC
--
Morrisville, NC
--
Morrisville, NC
--
Morrisville, NC
Bid Date: Jun 07 2024
Morrisville, NC
--
Morrisville, NC
Bid Date: Apr 18 2024
Morrisville, NC
Bid Date: Apr 18 2024
Morrisville, NC
Bid Date: Apr 11 2024
Morrisville, NC
Bid Date: Mar 26 2024
Morrisville, NC
--
Morrisville, NC
--
Morrisville, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.