BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Ballston Spa, New York. Completed plans call for the renovation of a power facility; and laboratory facility.

A. The Subcontractor shall provide all material, services, labor, tools, and equipment, necessary to construct this project. The work generally consists of but is not limited to the following description. Refer to the Subcontract Drawings for detailed requirements. 1. This project will replace the motor in the Building 28 addition (annex), install Government Furnished Equipment (GFE), replace the motor drive system, and utilize the spare breaker in the 3M switchgear to provide a medium voltage feeder to project equipment. 2. Work in the Power Electronics Room will install GFE and power panels. 3. The project includes removal of the test stand and installation of the motor adjacent to the dynomometer. 4. The project includes multiple crane lifts and material handling evolutions. 5. The project includes replacement of the lighting in the inverter room and power electronics room. All questions subsequent to the conference and tour shall be submitted to the Contracts Professional in writing by March 27, 2024 COB to allow for response without delaying proposals Addendum #1-#3 have been issued as of 4-11-2024.

Post-Bid

Thermal Power Generation

$2,000,000.00

Public - Federal

Renovation

139

19

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
74
Bidding Soon
1,053
All Active Projects
504
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

June 18, 2024

img_map_placeholder

To Be Determined, Ballston Spa, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.