BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Northbrook, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Village of Northbrook requests qualifications for professional engineering services for the oversight of the Shermer Corridor Improvements project. Introduction: The Village of Northbrook ("Village") is requesting proposals for consultant professional construction inspection services ("Consultant Services"), for Shermer Corridor Improvements from Walters Avenue to Willow Road ("Project"). This project includes construction of a sidepath on the east side of Shermer Road, median improvements, asphalt resurfacing, concrete panel replacement, curb repair, accessibility and intersection improvements, lighting and signal improvements, tree plantings, and decorative elements. A draft pre-final plan set has been provided along with this RFQ. The Village intends to commence with construction of both the sidepath and roadway improvements in late 2024 with the majority of construction occurring in 2025. Respondents must be able to demonstrate expertise with overseeing all aspects of state and federally funded bicycle and pedestrian related engineering tasks as well as roadway reconstruction. Submittals should include the firm's qualifications, project team, resumes, detailed project approach, and recently completed engineering work of similar scope (high value will be placed on experience assisting municipalities with Phase III engineering in areas of high traffic that required extensive stakeholder coordination as well as documentation required of federally or state funded projects). Background: In 2020, the Village of Northbrook began Phase I engineering on the construction of a sidepath on Shermer Road between Walters Avenue and Willow Road. Following two public information meetings and other stakeholder engagement, a final project development report (PDR) was approved in April 2023. This PDR recommended the construction of a sidepath on the east side of Shermer Road along with the shifting of the east curb line several feet into the roadway. Due to the disruptive nature of the project and the current condition of the road, it was determined that the asphalt portion of the roadway would be resurfaced and the concrete portion of the roadway would be partially replaced concurrently with the construction of the sidepath. Phase II engineering began in April 2023 and is expected to be completed in Summer 2024. Additional elements being reviewed in the Phase II engineering process including decorative lighting, wayfinding, accessibility improvements, median improvements, and landscaping improvements. While a recommended maintenance of traffic (MOT) plan is being proposed as part of the Phase II design, substantial coordination with the schools and businesses are anticipated to be needed as part of this Phase III engineering scope to ensure driveway and roadway impacts are minimally disruptive to local stakeholders. Description of the Construction Project: The Village's FY 2024-25 and 2025-26 Budgets (May 1, 2024 to April 30, 2026) has allocated funding for the construction of the Shermer Corridor Improvements Project. A brief summary of the construction work to be implemented can be found below). The proposed limits for the project will extend over approximately 1.50+/- miles. To the north, the project will connect to downtown Northbrook. To the south, the project will connect to Willow Road which would provide access to various commercial, industrial, and residential districts. This project looks to improve local access to Maple School, Glenbrook North High School, and the Metra Station. Additionally, the Village in partnership with the Village of Glenview recently completed construction of a multi-use trail on Shermer Road from Willow Road to West Lake Avenue. It is expected that the "Project" will improve connectivity towards this newly constructed path. The Village desires to implement this project in conjunction with concrete street patching and asphalt roadway resurfacing on Shermer road as well as spot curb replacement on the west side of Shermer road. This project has been awarded grant funding through the CMAP Surface Transportation Program (STP). The selected construction inspection firm will be required maintain grant required construction documentation and to assist the Village with the preparation of documentation that will be required to maintain eligibility through the STP. Questions and requests for information must be submitted before noon local time on April 11, 2024 to Aram Beladi, Assistant Village Engineer, at aram.beladi@northbrook.il.us. The Village will issue addendums and/or responses to RFI's on the Village's website *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Conceptual

Roads / Highways

$4,659,000.00

Public - City

Paving, Site Work

165

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
190
Bidding Soon
3,760
All Active Projects
1,532
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 1, 2024

October 31, 2025

img_map_placeholder

Willow Rd, Northbrook, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.