Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2024 at 8:00 PM

Updated April 16, 2024

This is a service / maintenance or supply contract in Morton, Illinois. Contact the soliciting agency for additional information.

McLean County Regional Planning Commission (MCRPC), Illinois, is seeking proposals from qualified consultants or consulting firms for the preparation of a Corridor Plan, funded partially by a federal RAISE planning grant, to reinvent the outdated, car-centric 10-mile stretch Veterans Parkway (I-55 Business Route/Old U.S. Route 66) to become a safer, multi-modal urban corridor in the Bloomington-Normal metropolitan area. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
80
Bidding Soon
1,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

Project location map

Multiple Locations, Morton, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed