BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brookshire, Texas. Completed plans call for site work for a water / sewer project.

As of July 3 2024 “The owner has selected a Construction Manager.” Mandatory contractor qualification statements are due no later than April 19, 2024, in the office of Kaluza, Inc. for their Proposal to be considered responsive. Any questions regarding the documents are to be addressed to the Attn: Richard Stolleis (RStolleis@kaluzainc.com) (281) 341.0808. SELECTION PROCESS o The selection process for this project will be accomplished in a one-step process as provided in the Texas Government Code Section 2269.253 o The District will receive, publicly open, and read aloud the names of the proposers submitting a proposal and submitted cost. o After the date of opening the proposals, the District will evaluate and rank each submission in relation to the criteria set forth in the published documents. o The final selection of a Construction Manager at Risk for this project will be based on a combined evaluation of qualifications and cost of services to determine the "best value" to the District. The District reserves the right to waive any informality and to reject any or all Proposals. o No Construction Manager at Risk will be finally selected until a contract between the Construction Manager at Risk and the Owner is signed. o By submitting a proposal, the Proposer agrees to waive any claim it has or may have against the Owner, the Engineer and their respective employees and agents, arising out of or in connection with the administration, evaluation, or recommendation of any proposal; waiver of any requirements under the Proposal Request and Qualification Submittal; and acceptance or rejection of any proposals; and award of the Contract. Provide a strong financial response, such as, but not limited to financial statement; generalfinancial information; surety detail; payment bonds detail; bonding capacity detail. (Financial Packet Due at same time as qualification statements. (April 19, 2024)) Financial Statements shall be emailed directly to the Lamar CISD CFO, Jill Ludwig at Ludwig@licsd.org. (April 19, 2024) GENERAL PROJECT INFORMATION o The contract shall be the A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor as modified by the Lamar Consolidated Independent School District along with AIA201-2017 General Conditions of the Contract for Construction as modified by the District. The contract will be provided after the selection of a CM. Note any major exceptions/issues you would raise relative to this document. o The Prevailing Wage Rates which have been adopted by this District are attached herein. o The District shall require the use of a standard Texas Statutory Performance Bond to guarantee the performance of the work and a standard Texas Statutory Payment Bond to guarantee the payment of the work in the amount of the initial contract sum (GMP). Each Proposer shall include as part of the percentage proposed for the General Conditions on the Proposal Form the premium cost for providing a 100% Statutory Performance Bond and a 100% Statutory Payment Bond. The bonds shall cover the faithful performance of the contract and payment of all obligations arising there under in such form as the Owner mayprescribe. o One hundred percent of all remaining balances in allowances and contingency funds will be returned to the District upon completion of the project. o All contract information including all actual project costs will be made available to theDistrict or it's agent at any time. A formal audit of the project may be conducted by an independent third party hired by the District at selected intervals during the construction phase and prior to final payment. o The Owner shall contract independently and separately from the Construction Manager, for the construction materials engineering, testing, and inspection services and the verification testing services necessary for acceptance of facilities per the Texas Government Code. o The Construction Manager shall be responsible for performing accurate background checks on all personnel to ensure that all personnel working on the project sites are suitable for working in a school environment. o A Certificate of Substantial Completion will be issued upon such completion of each phase of the project. Scope of Work: Secondary Site #8 Site Infrastructure Project Scope SITE: o77 acre site west of FM 359 for future location of two (2) school campuses. o100 acre site east of FM 359 for future location of two (2) school campuses. SCOPE: oApproximately 3,300 linear feet of paved roadway with storm sewer. oApproximately 6,175 linear feet of sanitary sewer. oApproximately 5,900 linear feet of water line. oApproximately 5,750 linear feet of storm sewer. oDetention facilities on the west tract. oDetention facilities on the east tract. oEarthwork for site leveling and balancing. oAddition of turn lanes on FM 359. oTraffic signal at intersection of the new road and FM 359. Project Construction Budget including Cost of Work, General Conditions Fee & CM Fee: oApproximately $16,000,000.00

Award

Water / Sewer

$25,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
220
Bidding Soon
4,312
All Active Projects
1,784
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 10, 2024

March 19, 2025

February 27, 2026

img_map_placeholder

FM359, Brookshire, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.