BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Halfway, Missouri. Working plans call for the renovation of a educational facility.

HVAC Installation Project Contact Mike Watkins, Maintenance Director, with specific questions at 417-298-2444 Bidders Must Agree to Comply With the Ten-hour Safety-training Requirements, the E-verify Requirements, and Supply Verification of Workers' Compensation Insurance. Selected Bidder Must Provide a Performance Bond for the Amount of the Contract. The Halfway R-iii School District Reserves the Right to Reject Any or All Bids, and to Determine the Award to the Benefit of the District. Furnish and install HVAC units for the following classrooms/areas: o FACS Room o Music Room o Science Room o Gym Entry hallway and restrooms o Main Entrance lobby and connecting hallway o Elementary Computer Lab o Girls restroom (next to elem. computer lab) o Deaf Education Room o Title Room (elementary) o Speech/PAT Room o Boys restroom (next to Speech/PAT Room) o Nurse's Office o Health Office (front & back sections) o Kindergarten room o Second Grade room o Boys and Girls restrooms (next to 2nd grade room) Variable Refrigerant Flow (VRF) split system preferred. Map for reference of room locations is enclosed.

Final Planning

Educational

$637,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
18
Bidding Soon
324
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

June 24, 2024

img_map_placeholder

To Be Determined, Halfway, MO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.