BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Santa Ana, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project is subject to the Community Workforce Agreement for Construction, Repair, Upgrade, Renovation, Modernization, Expansion, Rehabilitation and Improvement Work Projects dated June 27, 2017 entered into between the District and various labor unions (the "CWA"). The successful bidder and its subcontractors will be required by the District to be bound by the terms of the CWA section 00 73 49. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: BP 01 Asphalt A and/or C-12 The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: The Base Bid Amount Only All questions regarding the Contract Documents are to be directed in writing to the District. All prepbid request for information/clarification questions will be received until 4:00 PM on April 19, 2024. Questions or inquiries can be sent via e-mail to construction@sausd.us District must receive any request for product substitution a minimum of TEN (10) calendar days prior to the date of bid opening. As security for its bid, each bidder shall provide with its bid form o A bid bond issued by an admitted surety insurer on the form provided by the District, Cash, or A cashier's check or a certified check, drawn to the order of the Santa Ana Unified School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100 % Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available from the District or on the Internet. Bidders and Bidders' subcontractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Award

Roads / Highways

$243,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
112
Bidding Soon
2,393
All Active Projects
942
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 31, 2024

img_map_placeholder

1441 E Chestnut Ave, Santa Ana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.