Site work and paving for a mixed-use development in Rimersburg, Pennsylvania. Completed plans call for site work for a educational facility; for paving for a educational facility; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
It is the intent of this project to patch and sealcoat the parking areas at Union High School and Sligo Elementary School. Any errors or omissions in the instructions or specifications will not relieve the contractor from this obligation. 2. Bidders are responsible for field measurements and verification of existing conditions. The successful bidder will be responsible to document the total square yards of patching and sealcoating to be completed and must adhere to specified compacted paving thicknesses and sealcoating millage. 3. Limits of areas of work will be defined by the school district representative in cooperation with the successful bidder. 4. It is the intent to award the paving project to one bidder. 5. The Work must be performed between June 17, 2024 and August 2, 2024. All questions regarding the specifications and bidding requirements should be submitted to Mark Brown of the Union School District. Responses will be e-mailed or faxed to all bidders. Asphalt Patching at the High School 354 Baker St. Rimersburg, PA 16248 Bidding contractors must measure patch areas to confirm yardage prior to bidding Asphalt patching at various locations comprising approximately 1,307 square yards Saw cut perimeter of patched areas. Dig out approximately 1,283 square yards 5.5" deep Partial-depth patch by milling asphalt 2' deep in an area comprising 24 square yards Remove all debris from site Install 4" of 25mm Base Blacktop compacted on approximately 1,283 square yards Install 1.5" of 9.5mm Top Blacktop compacted on approximately 1,283 square yards Apply Tack Coat on approx. 24 square yards Install 2" of 9.5mm Top Blacktop compacted on approximately 24 square yards Seal all joints with PG 64-22. Seal Coat Blacktop at the High School 354 Baker St. Rimersburg, PA 16248 Bidding contractors must measure work area to confirm yardage prior to bidding Seal approx. 10,100 square yards (including concession Stand and track entrance areas) Edge clean all dirt and vegetation from the edges of the blacktop and all cracks Blow out all cracks with compressed air Apply PG 64-22 to all cracks 1/4 " wide or wider Treat any oil spots with Petro Seal Install Polymer-Modified Masterseal (PMM), application rate of .15-.18 Sealer must be applied by mechanical application (brush or squeegee) to break surface tension for better adhesion. Re-paint all lines and markings as they are currently. Seal Coat Blacktop at Sligo Elementary School 2013 Madison St. Ext. Sligo, PA 16255 Bidding contractors must measure work area to confirm yardage prior to bidding Seal approximately 4,100 square yards including under the pavilion (picnic tables will be removed prior to the start of the work) Edge clean all dirt and vegetation from the edges of the blacktop and all cracks Blow out all cracks with compressed air Apply PG 64-22 to all cracks 1/4 " wide or wider Treat any oil spots with Petro Seal Install Polymer-Modified Masterseal (PMM), application rate of .15-.18 Sealer must be applied by mechanical application (brush or squeegee) to break surface tension for better adhesion. Re-paint all lines and markings as they are currently. Contact Mark Brown Buildings & Grounds Supervisor with any questions Cell # - (814) 227-6396 Email - brownme@unionsd.net The project consists of patching and sealcoating parking areas within the Union School District.
Award
Sidewalks / Parking Lot
$3,600,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2024
June 17, 2024
Multiple Locations, Rimersburg, PA
Related To This Project
Rimersburg, PA
Bid Date: Jun 04 2024
Rimersburg, PA
Bid Date: Jun 04 2024
Rimersburg, PA
--
Rimersburg, PA
Bid Date: Jul 31 2023
Rimersburg, PA
Bid Date: Oct 19 2023
Rimersburg, PA
Bid Date: Jul 13 2022
Rimersburg, PA
Bid Date: Jul 07 2022
Coplay, PA
Bid Date: May 07 2024
Altoona, PA
Bid Date: May 07 2024
Indiana, PA
Bid Date: Apr 25 2024
Bethlehem, PA
Bid Date: May 02 2024
Baden, PA
Bid Date: May 29 2024
Harrisburg, PA
Bid Date: Apr 19 2024
Cranberry Township, PA
Bid Date: Apr 23 2024
Tobyhanna, PA
Bid Date: Jul 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.