Site work and paving for a civil project in Afton, Iowa. Completed plans call for site work for a road / highway; water / sewer project; bridge / tunnel; and for paving for a road / highway.

**As of June 19, 2024, project was awarded to C & J Conservation in the amount of Divion1 $83,838 and Division2 $55,910 total amount of $139,748.** Grading and Surfacing Improvements - Excavation, Class 10 - 3,170 CY; Subgrade Preparation (12" Thick) - 2,475 SY; Compaction Testing - 1 LS; Pipe Culvert, RCP, 15" - 65 LF; Granular Surfacing, Class 'A', 2" Thick - 2,475 SY; Granular Surfacing, Macadam, 6" Thick - 2,475 SY; Conventional Seeding, Fertilizing, and Mulching - 1 LS; SWPPP, Preparation - 1 LS; SWPPP, Management - 1 LS; Mobilization - 1 LS LOW BIDS Division 1: Low: C & J Conservation $83,838 2nd: TK Concrete $102,338 3rd: Western Iowa Utilities $112,505 4th: JNC Construction $113,550 5th: Hymbaugh Construction $119,260 6th: J & K Contracting $148,595 Sewer and Water Improvements - Sanitary Sewer Force Main, Trenchless, HDPE, 1-1/4" - 1,040 LF; Sanitary Sewer Service Stub, Trenched, PVC, 6" - 170 LF; Sanitary Sewer Cleanout - 2 EA; Water Main, Trenchless, RJ-PVC, SDR 17, 2" - 790 LF; Water Service Pipe, PE, 1" - 55 LF; Water Service Pipe, Corporation, 1" - 2 EA; Water Service, Curb Stop and Box, 1" - 2 EA; Water Service Valve and Box, 3" - 1 EA; Water Main Connection No. 1 - 1 EA; Yard Hydrant - 1 EA; Simplex Grinder Pump Station - 1 EA; Mobilization - 1 LS LOW BIDS DIVISION 2: Low: C & J Conservation $55,910 2nd: Western Iowa Utilities $64,425 3rd: Vicker Drilling $77,520 4th: Hoffman Communications $81,605 5th: Hymbaugh Construction $85,240 6th: J & K Contracting $86,075 Est. Value Notes: Div 1 - $121,390.00 , Div 2 - $89,675.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to Union County Conservation Board, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Union County Conservation Board. The bid shall contain no condition except as provided in the specifications. Liquidated damages in the amount of Six Hundred Dollars ($600.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the Union County Conservation Board on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. The contracts shall be fully completed and ready for final payment within 25 working days from written Notice to Proceed for each Division

Award

Roads / Highways

$139,748.00

Public - State/Provincial

Paving, Site Work

8

5

2

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
35
Bidding Soon
510
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 31, 2024

img_map_placeholder

Multiple Locations, Afton, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.