Site work for a water / sewer project in Edinburg, Texas. Completed plans call for site work for a water / sewer project.

PLEASE NOTE: The notice ID above is incorrect. It should read 12639524R0017 (I can't correct it.) Amendment 0001 is posted below. The purpose of this Statement of Work is to procure construction services for the 60,000 Gallon GWT as listed per the solicitation documents. The Contractor shall furnish all labor, equipment, and materials necessary to install and construct the items for installation of GWT. Install foundation of GWT and attach to foundation, including but not limited to concrete support for pipe and pumps and other accessories as necessary, guardrails, ladders, piping (interior or exterior) and piping brackets, Install new inlet valve, tank drain outlet, isolation valve (inlet and outlet), program SCADA system to monitor GST service status (in service or isolated manually to put out of service) and all necessary accessories to meet contract requirements. Install equipment attached to the tank, including alarms, gauges, heating equipment, controls, communication, necessary electrical wiring, lightning protection equipment tank heaters and/or insulation as required by code to prevent freezing and other accessories per the contract documents. The purpose of this Statement of Work is to procure construction services for the 60,000 Gallon GWT as listed per the solicitation documents. The Contractor shall furnish all labor, equipment, and materials necessary to install and construct the items for installation of GWT. Install foundation of GWT and attach to foundation, including but not limited to concrete support for pipe and pumps and other accessories as necessary, guardrails, ladders, piping (interior or exterior) and piping brackets, Install new inlet valve, tank drain outlet, isolation valve (inlet and outlet), program SCADA system to monitor GST service status (in service or isolated manually to put out of service) and all necessary accessories to meet contract requirements. Install equipment attached to the tank, including alarms, gauges, heating equipment, controls, communication, necessary electrical wiring, lightning protection equipment tank heaters and/or insulation as required by code to prevent freezing and other accessories per the contract documents. Contractor shall coordinate with the new WTP, raw water pipe and reservoir construction and submit any conflict for USDA's review. Determine best conduit routing, install instrumentation and controls, including modification of existing MTU SCADA panel as required. Prior to commencement of work, Contractor shall recommend and submit a phasing plan for review by USDA to maintain minimal or no service interruption of water supply during installation of the new 60,000-gal GWT to the WTP and future operation when one storage tank is down for maintenance or repair. The Contractor and designer of record shall determine the location of GWT and coordinate location with USDA for final determination. Contractor shall hire and pay for services of a third-party independent testing and inspection agency and laboratory. The Contractor shall begin performance within 10 calendar days and complete it within 365 calendar days after receiving The estimated magnitude of this project is between $500,000 and $1 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$548,000.00

Public - Federal

Site Work

15

14

2

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
288
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 26, 2024

img_map_placeholder

22675 N Moorefield Rd, Edinburg, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.