BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a fire / police facility in South San Francisco, California. Completed plans call for site work for a fire / police facility.

Question Deadline 07/17/2024 at 4:00 PM PT Police Station-Replace Existing Gate at Civic Campus Way ("Project"), located at One Chestnut Ave, South San Francisco, California. The Project includes, but is not limited to: Design, engineering, fabrication, demolition of existing gate, and installation of a new sliding vehicle gate. One of the gate entrances is located off Chestnut Avenue into a secure parking area. The second gate entrance is off Civic Campus Way into a secure parking area. Both gates have not functioned to Owner expectations and need to be replaced with new horizontal sliding gates. The gate from Chestnut has been replaced in another contract. The scope of work in this contract is to replace the gate from Civic Campus Way. the Surety on this bond will pay the same in an amount not exceeding the sum herein above specified in this bond; and, also, in case suit is brought upon this bond, the Surety will, and does hereby agree to, pay a reasonable attorney's fee, to be fixed and awarded by the Court and taxed as costs, and included in the judgement therein rendered. A. The Project consists of removal of the existing motorized gate and installation of a new gate. B. Work shall be constructed under a single prime contract C. Unless otherwise provided for in the Contract Documents, provide and pay for all labor, materials equipment, tools, construction equipment and machinery, trash service, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated in the Work. 1. Project Location: The project is located at 1 Chestnut Avenue, South San Francisco. Substantial Completion within 90 Calendar Days after Issuance of Notice to Proceed. Final completion shall be achieved 14 Calendar Days following date of Substantial Completion.

Award

Fire / Police

$52,400.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
79
Bidding Soon
1,765
All Active Projects
740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 26, 2024

img_map_placeholder

1 Chestnut Ave, South San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.