Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a fire / police facility in South San Francisco, California. Completed plans call for site work for a fire / police facility.
Question Deadline 07/17/2024 at 4:00 PM PT Police Station-Replace Existing Gate at Civic Campus Way ("Project"), located at One Chestnut Ave, South San Francisco, California. The Project includes, but is not limited to: Design, engineering, fabrication, demolition of existing gate, and installation of a new sliding vehicle gate. One of the gate entrances is located off Chestnut Avenue into a secure parking area. The second gate entrance is off Civic Campus Way into a secure parking area. Both gates have not functioned to Owner expectations and need to be replaced with new horizontal sliding gates. The gate from Chestnut has been replaced in another contract. The scope of work in this contract is to replace the gate from Civic Campus Way. the Surety on this bond will pay the same in an amount not exceeding the sum herein above specified in this bond; and, also, in case suit is brought upon this bond, the Surety will, and does hereby agree to, pay a reasonable attorney's fee, to be fixed and awarded by the Court and taxed as costs, and included in the judgement therein rendered. A. The Project consists of removal of the existing motorized gate and installation of a new gate. B. Work shall be constructed under a single prime contract C. Unless otherwise provided for in the Contract Documents, provide and pay for all labor, materials equipment, tools, construction equipment and machinery, trash service, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated in the Work. 1. Project Location: The project is located at 1 Chestnut Avenue, South San Francisco. Substantial Completion within 90 Calendar Days after Issuance of Notice to Proceed. Final completion shall be achieved 14 Calendar Days following date of Substantial Completion.
Award
Fire / Police
$52,400.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2024
August 26, 2024
1 Chestnut Ave, South San Francisco, CA
Related To This Project
South San Francisco, CA
--
South San Francisco, CA
Bid Date: May 30 2024
South San Francisco, CA
Bid Date: May 09 2024
South San Francisco, CA
Bid Date: May 31 2024
South San Francisco, CA
Bid Date: May 24 2024
South San Francisco, CA
--
South San Francisco, CA
Bid Date: Aug 27 2024
South San Francisco, CA
Bid Date: Jun 07 2024
South San Francisco, CA
--
South San Francisco, CA
Bid Date: Apr 25 2024
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.