Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2024 at 8:00 PM

Updated October 21, 2026

Site work for a water / sewer project in Pike Road, Alabama. Completed plans call for site work for a water / sewer project.

The Project consists of the following major components: 1. Installation of up to 4,000 LF of 6" through 12" PVC C900 water main and 255 LF jack and bore encasements in ALDOT ROW. For information concerning the Project, contact Jonah Taylor, P.E., Krebs Engineering at Jonah.Taylor@krebseng.com or 334-714-6899. Est. Value: $ 1,400,000.00 Site Directions: 12775 US HWY 80, Montgomery, AL 36117 The OWNER will only accept Proposals from contractors duly licensed by the Alabama State Licensing Board for General Contractors as required by applicable Alabama law, including without limitation Ala. Code 34-8-1, et seq., BIDDERS' Alabama General Contractor License Number shall appear on the outside of the envelope containing such bid prior to opening. A. The Work included in this Contract generally consists of installation of 12” PVC, C900 watermain, steel encased bores, and relevant appurtenances and connections in ALDOT ROW. The requirements of this Section and Division 1 apply to all of the Contract Documents. a. Description: Shall include all costs that are associated with installation of the water main, including excavation, bedding, backfill, installation of detection ball markers and warning tape, and surface restoration in unimproved areas of the water main in accordance with the latest version of Standard Specifications of the Montgomery Water Works and Sanitary Sewer Board of the City of Montgomery if applicable. b. Unit of Measurement: Linear Feet (LF) as measured along the centerline of pipe installed and tested and shall include the lengths of fittings and valves in the line. A general description of the work to be done is contained in the Invitation to Bid. The scope of the Project is specified in applicable parts of these Contract Documents.

Award

Water / Sewer

$503,180.00

Public - City

Site Work

13

16

6

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
33
Bidding Soon
862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

Project location map

12775 US-80, Pike Road, AL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed