BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Newton, Texas. Completed plans call for site work for a water / sewer project.

The scope of work is generally described as the construction of 5,910-linear feet of 3-inch water line and 2,400-linear feet of 2-inch water line on C.R.2036(1ST Street), C.R.2039(2ND Street), & C.R.2040(3RD Street). Question Deadline 04/23/2024 A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to (NEWTON COUNTY) or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin. (NEWTON COUNTY) reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by (NEWTON COUNTY) for a period not to exceed 30 / 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Bids are invited for several items and quantities of work as follows: 1) Provide for Mobilization. 2) Provide and Implement Traffic Control Plan, sealed by a Professional Engineer licensed in Texas. 3) Perform/Furnish & Install 3" PVC C900 DR18 or 3" HDPE DR11 (DIPS) by bore under roadway. (125-L.F.) 4) Provide/Furnish & Install 3-Inch C900 PVC water main with Tracer wire & Warning tape. (5,910-L.F.) 5) Provide/Furnish & Install 2-Inch C900 PVC water main with Tracer wire & Warning tape. (2,400-L.F.) 6) Provide/Furnish & Install 3-Inch Gate Valve & Box. (7-Each) 7) Provide/Furnish & Install 2-Inch Gate Valve & Box. (2-Each) 8) Provide/Furnish & Install 2-Inch Flush Valve with Splash pad. (2-Each) 9) Provide/Furnish & Install 2-Inch Air Release Valve with Traffic Rated (H20 Loading) Concrete Manhole (2-Each) 10) Provide/Furnish & Install 1" Long Side service connection with fittings. (10-Each) 11) Provide/Furnish & Install 1" Short Side service connection with fittings. (10-Each) 12) Provide/Furnish & Install Ultrasonic Meter with Plastic Meter Box. (20-Each) 13) Provide/Furnish Trench Safety Plan, sealed by a Professional Engineer licensed in Texas. 14) Provide/Furnish & Install Trench Safety System for all excavations in excess of 5-feet deep. 15) Provide/Furnish & Install Special Shoring as required for Trench Safety. 16) Provide/Furnish & Install Final Stabilization/Site Dress-up/Seed Route. The scope of work is generally described as the construction of 5,910-linear feet of 3-inch water line and 2,400-linear feet of 2-inch water line on C.R.2036(1ST Street), C.R.2039(2ND Street), & C.R.2040(3RD Street). The Contractor shall be responsible for providing and implementing a Traffic Control Plan. The Contractor will field verify all existing utilities prior to excavation. The Contractor shall construct 245-linear feet of 3-inch water line along the West side of 1 ST Street & 450-linear feet of 3-inch water line along the East side of 1ST Street up to 3RD Street. Contractor shall provide the necessary fittings to tie into existing 2-inch water line on 1ST Street and proposed 2-inch water line on 3 RD Street. The Contractor shall perform exploratory excavation at Station 6+40 (L) to verify line size and location coming from Water Treatment Facility. The Contractor shall install a 3-inch water line from Water Treatment Facility to the North side of C.R.2037. Contractor shall furnish and install 3" PVC C900 DR18 or 3" HDPE DR11 (DIPS) by bore under roadway. The contractor shall disinfect and complete all testing before installing new long side and short side services, new meters and plastic meter boxes. All long side services shall be bore. All proposed gate valves shall be installed at designated locations shown on the plans. The Contractor shall construct 5,215-linear feet of 3-inch water line along the north side of 2 ND Street. The Contractor shall perform exploratory excavation at the intersection of 2 ND Street & C.R.2041 to verify water line size and location. Contractor shall furnish and install 3" PVC C900 DR18 or 3" HDPE DR11 (DIPS) by bore under roadway. A 2-inch flush valve with concrete splash pad shall be constructed on the dead-end line. The contractor shall disinfect and complete all testing before installing new long side and short side services, new meters and plastic meter boxes. All long side services shall be bore. All proposed gate valves shall be installed at designated locations shown on the plans. Contractor shall install 2-inch air release valve as designated on plans. The Contractor shall construct 2,400-linear feet of 2-inch water line along the South side of 3 RD Street. A 2-inch flush valve with concrete splash pad shall be constructed on the dead end line. The contractor shall disinfect and complete all testing before installing new long side and short side services, new meters and plastic meter boxes. All long side services shall be bore. All proposed gate valves shall be installed at designated locations shown on the plans. The Contractor shall also be responsible for hauling and disposal of all excavated materials and demolished structures at no additional cost to the Owner

Bid Results

Water / Sewer

$212,471.00

Public - County

Site Work

13

8

11

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
10
Bidding Soon
348
All Active Projects
179
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

img_map_placeholder

Multiple Locations, Newton, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.