Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 17, 2024 at 8:00 PM
Updated May 18, 2024
Site work and paving for a bridge / tunnel in Laurel, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Principal Items of Work are Approximately as Follows: Roadway Items Mobilization Lump Sum L.S. Clearing & Grubbing Lump Sum L.S. Removal of Bridge (Sta. 14 + 10.85) 1.00 Unit Removal of Pipe (All Sizes) 36.00 Lin. Ft. Unclassified Excavation (F.M.) 261.00 Cu. Yd. Muck Excavation (F.M.) 171.00 Cu. Yd. Borrow Excavation (F.M.E.) (Contractor Furn.) 2,473.00 Cu. Yd. (Class 9-6) Excess Excavation (LVM) 307.00 Cu. Yd. Temporary Stream Diversion 1.00 Each Crushed Stone, Size 825 753.00 Ton 15" Reinforced Concrete Pipe, Class III 40.00 Lin. Ft. 15" Reinforced Concrete Pipe, End Section 2.00 Each Filter Material for filter Beds, Type "A" 576.00 Ton Roadway Construction Surveying Lump Sum L.S. Right-of-Way Markers (Type II) 8.00 Each Maintenance of Traffic Lump Sum L.S. Additional Construction Signs 0.00 Sq. Ft. Reflectorized Traffic Warning Signs 2.00 Each (Encapsulated Lens) Erosion Control Items Agricultural Limestone 3.60 Ton Commercial Fertilizer (13:13:13) 1.80 Ton Ammonium Nitrate 0.18 Ton Seeding 1.80 Acre Vegetative Materials for Mulch 5.40 Ton Solid Sodding 85.00 Sq. Yd. Portland Cement Concrete Paved Ditch 15.00 Cu. Yd. Temporary Silt Fence (Type II) 1,505.00 Lin. Ft. (AOS - 0.15 - 0.84) Wattles, 12" 300.00 Lin. Ft. Loose Riprap, (100 Lb.) 66.00 Ton Loose Riprap, (200 Lb.) 147.00 Ton Geotextile Under Riprap, Non-Woven, 393.00 Sq. Yd Total Contract Time as Advertised: 100 Working Days Certified Check or Bid Bond for five percent (5%) of total bid payable to Jones County and the State of Mississippi must accompany each proposal. Bidders are hereby notified that any proposal accompanied by letter qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid, and such proposals will not be considered in making the award.
Post-Bid
Bridges / Tunnels
$500,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
June 17, 2024
Multiple Locations, Laurel, MS
Related To This Project
Laurel, MS
Bid Date: May 01 2024
Laurel, MS
Bid Date: May 31 2024
Laurel, MS
Bid Date: Jun 14 2024
Laurel, MS
Bid Date: Jun 27 2024
Laurel, MS
Bid Date: Jun 14 2024
Laurel, MS
Bid Date: Jun 14 2024
Laurel, MS
Bid Date: Jun 14 2024
Laurel, MS
Bid Date: Aug 02 2024
Laurel, MS
--
Laurel, MS
Bid Date: Feb 07 2024
Laurel, MS
Bid Date: Feb 07 2024
Laurel, MS
Bid Date: Feb 07 2024
Laurel, MS
Bid Date: Feb 07 2024
Laurel, MS
Bid Date: Jan 10 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
