BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2024 at 8:00 PM

Updated June 7, 2024

Site work and renovation of a municipal facility in Seattle, Washington. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

The project scope includes but is not limited to: Exterior Sealant Replacement: Removal of existing elastomeric sealant at several Conditions; Install new Sealants. Painting Exterior Railings: Repaint all exterior railings, guardrails, and supports as indicated in the Drawings. Repair of broken/cracked stone panels, including but not limited to: Cleaning, prepping and filling of areas of spalling. Cleaning, prepping, reinforcing, and filling cracks. Replacement of panels that are unable to be repaired. (Additive) Alternate #1: Canopies and Metal Painting 1. Clean, sand, and prepare all metal railings, guardrails, and metal canopy support structures in area of work as shown on the Drawings. Repaint all metal railings, guardrails, and metal canopy support structures in area of work as shown on the Drawings. 2. Clean, repair, and prepare all EFIS wall and soffit finishes in area of work as shown on the Drawings. Recoat all EFIS finishes in area of work as shown on the Drawings. 3. Clean, demolish, and prepare for replacement of all metal framed canopy glazing sealants and gaskets in area of work as shown on the Drawings. Provide new sealant and gaskets in area of work as shown on the Drawings. (Additive) Alternate #2: 5th Ave Gallery Building 1. Clean, demolish, and prepare for replacement of all glazing sealants and gaskets in area of work as shown on the Drawings. Provide new sealant and gaskets in area of work as shown on the Drawings. 2. Clean, demolish, and prepare for replacement of all metal panel sealant in area of work as shown on the Drawings. Provide new sealant in area of work as shown on the Drawings. Base: $981,464; (Additive) Alternate #1: $344,315; (Additive) Alternate #2: $231,098 CLARIFICATION DEADLINE 4/24/2024 5:00 PM INCLUSION PLAN: For purposes of the Inclusion Plan, this is considered a WEATHERIZATION type of project with a Past Performance of 10% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at Carmen.Kucinski@seattle.gov or 206-684-0188.

Award

Municipal

$914,859.00

Public - City

Renovation, Site Work

44

22

7

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
79
Bidding Soon
1,793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 31, 2024

Project location map

700 5th Ave, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.