BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Crestline, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Pavement Replacement Services. The DVBE Participation Program applies, and a three percent (3%) goal is required for this IFB. The DVBE Incentive Program may also apply to this IFB. See Section D, Special Programs, Item 1, in this IFB for requirements. Contractor shall possess a C12-Earthwork and Paving Contractor or an A-General Engineering Contractor license issued by the California Contractors State Licensing Board (CSLB). Bidder must have, at time of bid submittal and for the duration of the contract, a valid, current C12-Earthwork and Paving Contractor or a A-General Engineering Contractor license issued by the Contractors State License Board (CSLB), for the type of work to be performed. Bidder shall obtain, pay for and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by CAL FIRE (reference Business and Professions Code Section 7028.15). Bidder's Bond is Required for Bids $903,000 and Greater: Bidder Shall Submit a *bid Bond (Executed by an Admitted Surety Insurer) With Bid as Described Herein. The Bidder's Bid Bond Shall Be No Less Than 10 Percent (10%) of Bidder's Total Bid, Must Be Notarized and Include the Embossed Surety Seal and Must Include a Power of Attorney if the Signee is Not an Officer of the Surety. Submittal of a Bid Bond That is Not in the Appropriate Amount, Signed and Stamped With the Surety Seal, or Failure to Submit a Bid Bond Shall Be Cause for Rejection of Bid. *the Bidder May Also Submit, in Lieu of a Bidder's Bond, One of the Following Forms of Bidder's Security: Cash, Cashier's Check, or Certified Check Made Payable to Cal Fire. Potential Bidders who attended the mandatory pre-bid walk-through may submit written questions regarding the bid by April 19, 2024. All questions should be emailed in writing to Anton.Snytkin@fire.ca.gov. NO QUESTIONS will be entertained after April 19, 2024. Contractor and each Subcontractor shall preserve their payroll records for a period of three (3) years from the date of completion of the Agreement. The awarding agency reserves the right to reject all bids. The agency is not required to award an agreement.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
240
Bidding Soon
3,478
All Active Projects
1,503
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2024

May 31, 2024

April 30, 2025

img_map_placeholder

23496 N. Miller Canyon Road, Crestline, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.