BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint Augustine Beach, Florida. Completed plans call for site work for a water / sewer project.

St. Johns County is soliciting a quote from a qualified Contractor to be responsible for providing any and all labor, materials, equipment, supervision and transportation required to conduct the following beach tilling scope of work: Maximum work area - between, and including, (FDEP lines) R76 through R102.5 Sea conditions may prevent safe access to some areas - field-decision to be made in consultation with St. Johns County prior to and during tilling activity Initial assessment shows sea conditions may restrict the work area to only Zone 1 Beach access points - by Exxon gas station near (near R83), South Ponte Vedra Park (near R95 only 8ft wide), Usina Ramp (by Reef Restaurant, near R109) Tilling depth = 24 inches Tilling zone: Tilling shall be completed by Zone, starting with Zone 1 Beach Segment Extents Tilling Area Length acres ft Zone 1 R76-R89.5 11 14,177 Zone 2 R89.5-R102.5 14 13,364 Total R76-R102.5 25 27,541 Contingent on the oceanic conditions during tilling, and the type of equipment used, Zone 2 may not be accessible for tilling Maximum length of total tilling zones = approximately 27,600 ft Zone 1 = 14,177 ft Zone 2 = 13,364 ft o Maximum tilling area = about 25 acres Zone 1 about 11 acres Zone 2 about 14 acres o Till between the wrack line and the seaward toe of vegetation or the seaward toe of dune scarp, whichever is more seaward Avoid all vegetated areas that are at least 3 ft2 (square feet) in size Keep 3 ft away from all vegetated areas Keep 10 ft away from seawalls, revetments, and upland structures Create a relatively even beach surface with no deep cuts or furrows Drag chain-link fencing or other material after tilling to accomplish such relatively even surface Overlap the tilling passes to allow even and thorough tilling Schedule All work must be completed prior to May 1, 2024.

Award

Water / Sewer

$60,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
46
Bidding Soon
804
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

April 23, 2024

img_map_placeholder

To Be Determined, Saint Augustine Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.