BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Hinton, Alberta. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

In Phase 2, the majority of the trail will be reclaimed/replaced by a longer loop trail, improving the OHV trail riding experience with access points to MacKenzie Creek, scenic viewpoints, and a day-use area mid-way through the loop. The new trail will also facilitate monitoring and enforcement of the fishing closure by the Fish & Wildlife Enforcement Branch. The Project involves the rehabilitation of MacKenzie Creek (i.e., erosion control, watercourse crossing improvements), re-routing OHV trails away from MacKenzie Creek, and creating a sustainable OHV trail loop with an enhanced OHV user experience. The Project focuses on the following four components: .1 Remediation of current OHV impacts. .2 Installation of appropriate watercourse crossings (bridges, culverts, etc.). .3 Upgrade, re-routing, and construction of OHV trails. .4 Physical and biological assessments of the MacKenzie Creek system and evaluation of project impacts. The MacKenzie Creek Trail Phase 2 Project Plan is attached in Appendix 4. Maps of the proposed Phase 2 trail alignment are attached in Appendix 6. The purpose of this RFP is to invite Proposals from suitably qualified Proponents who demonstrate sufficient experience and qualification to provide detailed design, secure approvals, prepare tender documents and perform contract administration and construction monitoring services for the proposed works as identified and supported by the Project Plan. TIMELINE: Request for Proposals from engineering consultants is underway. Main construction work is planned for April-August 2025. Further update pending award of contract. *Budget is unreleased.

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

36

7

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
5
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

To Be Determined, Hinton, AB


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.