BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in El Cerrito, California. Completed plans call for the demolition of a swimming pool; and for site work for a swimming pool.

The City of El Cerrito is requesting proposals from contractors for demolition of the El Cerrito Swim Center Slide. The Scope of Work for this project includes the removal of the existing slide tower, slide flume, slide stairs and risers, This work also includes the protecting all existing bolts imbedded in the foundations securing the structure, protecting and capping off of the existing water supply piping to the slide flume and the hauling away of all demolished materials to leave a clean area for the later installation of a new slide structure. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as described below and is indicated on the attached special plan, that is attached herein and as follows: o Demolish existing fencing around the slide and stairs and coordinate with Recreation Staff for on-site storage o Demolish and dispose of the existing slide tower, slide flume, and slide stairs and risers o Protect and cap off the existing 8" Schedule 80 water supply pipe to the slide flume to 8" above finished concrete grade and securely and carefully protect it for future City use o Unscrew all nuts securing the tower and stair structures to the bolts imbedded in the below-grade foundations at five (5) locations o Remove all structural supports from existing bolts imbedded in the existing below grade foundations and securely and carefully protect all bolts at five (5) foundation support locations for future City use o Repair cracks in the concrete elements of the flume and stair supports utilizing a pressure-injected epoxy adhesive in general accordance with ACI 503.7-07 o Haul away all demolished materials to leave a clean area for the later installation of a new slide structure o Patch holes or openings in the pool deck where the fencing, slide tower, slide flume, and slide stairs and risers were removed o Provide temporary fencing around the work area in between work hours when the pool is open to the public o Work hours shall be Mondays through Fridays, 7 AM to 3 PM, and completed within 15 working days The successful bidder, including prime contractor and subcontractors, will be required to obtain and pay for City Business Licenses. The work to be performed shall be completed within 15 working days after issuance of a Purchase Order and Notice to Proceed. Time is of the essence.

Post-Bid

Swimming Pools

$400,000.00

Public - City

Demolition, Site Work

14

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
95
Bidding Soon
1,847
All Active Projects
689
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 31, 2024

img_map_placeholder

7007 Moeser Ln, El Cerrito, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.