BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Greenwich, Connecticut. Completed plans call for the renovation of a educational facility.

Provide and install 2' x 2'ceiling tiles in existing grid. Tiles are to be Armstrong CALLA Square Lay-in Tegular or approved equal (to be determined by District) The contractor shall be responsible to; Removal and proper disposal of all existing ceiling tiles Remove and reinstall/reconnect any and all ceiling fixtures such as lights fixtures or HVAC grills that may need to be moved during ceiling tile installations. Coordinate the removal and reinstallation of Safety and Security Components such as Fire Alarm fixtures, surveillance cameras, smoke detectors and exit signs Questions concerning this bid will be received by email only directed to: Bid Department, (bid_department@greenwich.k12.ct.us). In the "Subject" line you must put Bid #2439-24 Ceiling Tile Replacement. All questions must be received no later than noon on September 12, 2024. All answers will be posted as an addendum on our website by noon on September 19, 2024. The service and work contemplated under this Contract shall be completed in full on or before August 29, 2025 The Board of Education reserves the right to waive any informality in the bid or reject any or all bids or to accept any bid which appears to be in the best interest of the Board. Provide and install 2' x 2'ceiling tiles in existing grid. Tiles are to be Armstrong CALLA Square Lay-in Tegular or approved equal (to be determined by District) o The contractor shall be responsible to; o Removal and proper disposal of all existing ceiling tiles o Remove and reinstall/reconnect any and all ceiling fixtures such as lights fixtures or HVAC grills that may need to be moved during ceiling tile installations. o Coordinate the removal and reinstallation of Safety and Security Components such as Fire Alarm fixtures, surveillance cameras, smoke detectors and exit signs o Provide a detailed schedule at least 3 weeks prior to starting work in order for the District to coordinate to schedule summer cleaning operations. o Include for all ladders, scaffolding, lifts and equipment to perform the Work. o Provide the proper amount of qualified personnel to manage the Work in order to properly complete the work within the contractual schedule. o Keep site clean from all garbage and debris caused by performing the Work and is to keep site clean from all garbage and debris caused by performing the Work o Shall notify the district of any with the existing grid system and if approved, shall make repairs via the identified allowance ($20,000) Take delivery of all manufactured materials in original containers bearing manufacturer's name and brand. Only one brand/model/color tile is to be used throughout job. Store materials within building in locations as directed by District. o Order additional 5% of type of acoustical unit specified, for maintenance use, at no additional cost to the City. The additional "attic stock" will be turned over to the District in unmarked and undamaged packing as received from the vendor. o Desks and classroom furniture will be left in classrooms, offices and work spaces throughout the project. The contractor will need to work around these larger items. The District will assist in moving smaller pieces of furniture as needed. District Staff will put away smaller items so there is clear floor space to work with. o The contractor shall be responsible for dust control and project clean up at the end of each shift. As an example, desks, furniture and classroom electronics (desktops, Smart Boards etc..) shall be covered with plastic while working within the room and the contractor shall be responsible for vacuuming or cleaning up and dust and debris. o Contractor shall be responsible for daily site clear of materials removed and packaging materials. o Provide a one-year parts and labor warranty as well as any additional manufacturer warranties. o A qualified representative from the Lead Contractor MUST be onsite daily. This representative will have thorough knowledge of the project including but limited to: Scope of Work to be performed, logistical plans, product delivery dates and schedule of work.

Post-Bid

Educational

$60,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
171
Bidding Soon
4,114
All Active Projects
1,606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

img_map_placeholder

10 Hillside Rd, Greenwich, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.