BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The deadline to ask questions is 4/23/2024 4:00 PM CST CONTRACTOR agrees to subcontract at least three percent (3%) of the contract value to a certified African American Business Enterprise (AABE) firm headquartered or having a significant business presence within the San Antonio Metropolitan Statistical Area (SAMSA). This three percent (3%) subcontracting goal will also count toward the aforementioned nine percent (9%) M/WBE subcontracting goal. Questions are to be submitted in writing in the Questions and Answers section online The City of San Antonio point of contact for this solicitation is Procurement Specialist II, Melissa Ortega, Melissa.Ortega1@sanantonio.gov. Questions are to be submitted in writing in the Questions and Answers section online Estimate: $9,950,000.00 Project construction may include but is not limited to: street reconstruction to include subgrade proofrolling and treatment, installation hot mix asphaltic base and surface courses, concrete pavement, flexible base course, concrete curbs, sidewalks, curb ramps, driveways, retaining walls, mailbox relocations, topsoil and sodding, pedestrian rail, signage and striping, tree removal and installation, speed humps, tackless tack coat, and minor utility adjustments to include adjustment of existing manholes and valve boxes, relocating customer shutoff valves, backflow preventers and pressure reducing valves, existing meter and meter box relocation, short and long service relays, and adjusting existing sanitary sewer cleanouts. This Task Order Contract (the "Contract") shall take effect on the date approved by the San Antonio City Council (Effective Date) and continue in full force and effect for 183 calendar days from Effective Date (Initial Term) unless extension or earlier termination shall occur pursuant to any of the provisions hereof.

Bid Results

Roads / Highways

$9,751,630.00

Public - City

Paving, Site Work

29

12

2

7

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
39
Bidding Soon
2,037
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

July 2, 2024

img_map_placeholder

Multiple Locations, San Antonio, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.