Renovation of a transportation facility in Miami, Florida. Completed plans call for the renovation of a transportation facility.

**As of June 03, 2024, the anticipated construction start date and end date are not yet determinnnnnnnnn Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the general interior renovation, modernization and ADA improvements of 4-sets (male, female, unisex, & janitor''s closet) of existing public restrooms at the Terminal D of the Miami International Airport including new partitions, new floor, wall, and ceiling finishes, new toilet partitions, new vanity counter tops, new toilet accessories, new plumbing systems, new power and lighting systems, and modifications to fire alarm, fire sprinkler, and HVAC systems. The demolition and renovation shall be performed in a minimum of two phases. CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans & Technical Specifications for further description of the scope of work. The Department specifically reserves the right to review and approve any and all third party contracts with respect to the Project before the Agency executes or obligates itself in any manner requiring the disbursement of Department funds, including consultant and purchase of commodities contracts, or amendments thereto. MDAD reserves the right to suspend non-compliant contractors from participation in the MDAD/MCC 7360 Work-Order Based program LICENSE: Note: Pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, selected Contractors must possess a valid, current, and active State of Florida and/or Miami-Dade County contractor''s license issued by the County''s Construction Trades Qualifying Board and which is consistent with the requirements of their respective trade and the scope of work. LIQUIDATED DAMAGES: If the awarded contractor shall neglect, fail, or refuse to complete the work within the time specified for Substantial Completion in the Notice to Proceed (NTP), then the contractor hereby agrees, as part of the consideration for the awarding of this Contract, to pay to the Owner, as liquidated damages and not as a penalty, the sum of $678.08 per day for each calendar day beyond the dates set forth in the NTP and/or Work Order(s) All quantities provided with the bid documents are estimated quantities based on the project scope of work. It is the bidder''s responsibility to confirm any and all estimated quantities or amounts reflected on the bid documents to generate a "responsive and responsible" bid. Errors, omissions and/or discrepancies in quantities shall be brought-up to the attention of the MDAD team via the request for information (RFI) process during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation and/or any engineering certificates required. Estimated Value: $3,369,042 BID BOND AND PERFORMANCE & PAYMENT BOND: Prospective bidders shall submit a Bid Bond at the time of Bid submission. Bidders may use the Surety Company standard bid bond. Alternatively, a certified or cashiers check will be acceptable in lieu of the bid bond. The Performance & Payment (P&P) bond must be submitted, using the contract specified form, within ten (10) working days from receipt of the Recommendation for Award (RFA) or time extension approved by the MDAD project manager. The P&P bond shall be required for the full contract amount. P&P Bond shall be submitted once the low responsive and responsible bidder is determined and the Recommendation for Award is issued. The deadline for submittal of questions and/or RFIs is no less than five (5) working days before the RPQ bid due/opening date and time

Award

Transportation Terminals

$4,026,452.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
42
Bidding Soon
1,076
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 24, 2024

img_map_placeholder

2100 NW 42nd Ave, Miami, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.