Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Orange, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Install CFCI Rubber Surfacing & OCFI Playground Equipment at Child Development Center Scope of Services This project includes but is not limited to excavation of existing dirt/native soil, provide and install compacted agg subbase, concrete curbs, provide and install two (2) sump drains, Contractor Furnished Contractor Installed Poured-In-Place rubber surfacing (CFCI), and installation of Owner Furnished Contractor Installed (OFCI) Playworld playground equipment. Online Q&A Yes Q&A Deadline 04/18/2024 4:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,500 per calendar day Project Duration 30 Days from issuance of NTP Categories 20000 - Contractor - A-General Engineering License Requirements Class A and Factory Certified Installer through Playworld, see Notice to Bidders Contractor responsible for: 1. Unloading the playground equipment at the job site. 2. Demolition of existing equipment, unless already removed by District.4. Form and install new concrete curbs, 6" wide x 8" deep x 302 linear feet.5. Provide and install two (2) sump drains (3'L x 4'W x 5'D pit filled with 3/4 " crushed rock wrapped in geo-fabric) along the south side of the enclosure. 6. Installation of new Playworld equipment as shown in Drawings & Specifications - Playground Equipment. Note: Sandbox/mud kitchen garden areas, grass area, new concrete area is not part of this scope of work. 7. Provide and install Poured-In-Place new rubber surfacing, 3.5" thickness for a 8' critical fall height, 4,285 sq ft. Color: 50% Black / 50% Beige, aromatic binder. We request that you update your prospective bidder status and indicate the reason for not bidding on this project.
Bid Results
Playgrounds / Parks / Athletic Fields
$139,425.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2024
May 24, 2024
250 S Yorba St, Orange, CA
Related To This Project
Orange, CA
--
Orange, CA
--
Orange, CA
Bid Date: May 15 2024
Orange, CA
Bid Date: May 20 2024
Orange, CA
Bid Date: May 14 2024
Orange, CA
Bid Date: Jun 06 2024
Orange, CA
Bid Date: Jun 05 2024
Orange, CA
--
Orange, CA
Bid Date: Apr 17 2024
Orange, CA
Bid Date: Apr 11 2024
Orange, CA
Bid Date: Apr 19 2024
Orange, CA
Bid Date: Apr 26 2024
Orange, CA
Bid Date: Apr 19 2024
Orange, CA
Bid Date: Apr 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.