BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 1, 2024 at 8:00 PM

Updated June 2, 2024

Site work and outdoor lighting for a road / highway in Austin, Texas. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Project Estimate: NTE $1M Following is a summary of information for this Project. Bidder is cautioned to refer to other sections of the Project Manual, Drawings and Addenda (Bid Documents) for further details. The City of Austin, hereafter called OWNER, is requesting Bids for furnishing all labor, materials, equipment, supervision, and incidentals, and for performing all Work required for the following: Project: Located at: Street Lighting Construction: Bluff Springs Road, McNeil Drive Corridors Bluff Springs Road (William Cannon Drive to Slaughter Lane) and McNeil Drive (US HWY 183 to Parmer Lane) The Work consists of roadway lighting installation including installing new wooden utility poles with mast arm lighting, installing new lighting on existing utility poles, and installing new LED luminaires to replace existing high pressure sodium lights. This contract includes work on two (2) road corridors: Bluff Springs Road from William Cannon Drive to Slaughter Lane, approximate project length is 2.576 miles; McNeil Drive from US HWY 183 to Parmer Lane, approximate project length is 1.74 miles. o Some work will occur inside electrical high-voltage zone, which is defined as within five (5) feet of the primary electric distribution lines. All work occurring within the high-voltage zone must be performed by an Austin Energy (AE) Qualified Electrical Contractor (QEC), irrespective of whether they are a prime or subcontractor. o Vegetation Management may be an applicable scope of work including related line clearing needed near high-voltage zone. Section 00400 contains information about becoming an AE QEC and specific requirements for vegetation management. This is a public safety roadway lighting project of the City of Austin Transportation and Public Works (TPW) Department. These public safety roadway lighting projects are being implemented by the TPW Department in service to its Vision Zero program which strives to end traffic related fatalities and serious injuries on city roadways. The street lighting infrastructure will be owned and maintained by the City of Austin and its wholly owned Austin Energy Department. Federal – Aid Project Numbers: STP 2024(498)HES CSJ: 0914-04-338, 0914-04-339 CITY OF AUSTIN CSJ: 0914-04-339 CSJ: 0914-04-338

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Outdoor Lighting, Site Work

242

9

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
145
Bidding Soon
2,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

July 15, 2024

Project location map

Multiple Locations, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.