BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Centralia, Washington. Completed plans call for site work for a water / sewer project.

The work to be performed under these Contract Documents consists of furnishing all labor, material, equipment, and appurtenances necessary for construction of the WWTP Screw Press Dewatering Project. Work will include removal of the existing belt press system, installation of the owner-provided screw press system, mechanical process equipment and piping systems, electrical and instrumentation, and other work in accordance with the contract provisions, contract drawings and applicable codes and regulations. The project is located at the Wastewater Treatment Plant at 1101 Goodrich Road in Centralia, Washington. The City of Centralia hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The City of Centralia encourages contracting procedures that provide M/WBEs equal opportunity to participate as subcontractor on City contracts. All bids must be submitted on the forms furnished for that purpose, and each proposal must be accompanied by cash, bid bond, or certified check made payable to the City of Centralia, in an amount of not less than five (5) percent of the total bid. The bid shall be labeled WWTP Dewatering System Improvements Project Bid on the envelope. The City of Centralia reserves the right to reject any and all bids or waive irregularities in the bid or bidding. Questions regarding the bid documents should be submitted through the question portion of the website and all responses to the questions will be on the website. The City provides reasonable accommodations to persons with disabilities. We invite any person with special needs to contact the City Clerk at 360-330-7670 at least seventy-two (72) hours prior to the Bid opening to discuss any special accommodations that may be necessary. The work includes, but is not limited to the following: 1. Receiving, storage, installation and startup of Owner-furnished equipment. Startup of Owner -furnished equipment will be led by the Owner-Furnished Equipment Supplier with support from the Contractor. 2. Demolition of existing structures and equipment; including existing, belt-press installation provisions, pre-engineered steel building partial wall removal, and submersible sludge pumps in the WAS holding tank north of the solids handling facility. 3. Civil sitework, including, excavations, installation of underground utilities, concrete slab, and site restoration. 4. Installing new biosolids dewatering equipment (Owner-Furnished Equipment). 5. Providing mechanical process equipment and piping systems. 6. Electrical and instrumentation work as required to provide an operational system, including reprogramming of existing VFDs. 7. Control system integration support and coordination with the OwnerFurnished Equipment Supplier. 8. Testing and Commissioning support and coordination with the OwnerFurnished Equipment Supplier

Bid Results

Water / Sewer

$949,718.00

Public - City

Site Work

45

51

9

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
28
Bidding Soon
661
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

1101 Goodrich Rd, Centralia, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.