BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Owensboro, Kentucky. Completed plans call for the renovation of a educational facility.

Scope of work for the TAB (Testing Adjusting and Balancing) Agency consists of furnishing all required materials, tools, instruments, coordination, participation and labor to perform and complete the TAB services per the Project plans and specifications for the above referenced Building Project. See special conditions for Project Information/Scope. KCTCS - Replace HVAC System Phase I, Owensboro CTC, Owensboro, Kentucky, as set forth in the specifications and as shown on the drawings prepared by Marcum Engineering, and approved by the Department for Facilities and Support Services of the Commonwealth of Kentucky and under the terms and conditions to this Request for Bid. Bids will be received from Prime Contractors on a Lump Sum Bid Basis for the total project. All phases of work shall be bid to and through the Prime Contracting Firms. Bids shall be submitted in the manner herein described and on the official bid document form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Award shall be issued to the lowest-cost responsive bid properly submitted by a responsible bidder. The Bid Document shall contain all qualifying requirements and forms. It is the intent of the Commonwealth of Kentucky to use all available funds. Kentucky Workers' Compensation: Pursuant to KRS 45A.480, the Commonwealth of Kentucky may not contract with any person not in compliance with Kentucky's KRS Chapter 342 workers' compensation insurance requirements. Bid is subject to Reciprocal preference for Kentucky resident bidders and Preferences for a Qualified Bidder or the Department of Corrections, Division of Prison Industries (KAR 200 5:410) The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. PROJECT INFORMATION / SCOPE: A. This project consists of replacement and/or upgrades to HVAC systems at Campus Center and Academic Building at the Owensboro Community & Technical College (OCTC) Main Campus. The work generally consists of, but is not limited to, the following: replacement of boilers and self-contained airconditioning units with geothermal heat recover chillers and chilled water air-handling units, replacement of VAV boxes, and improvements to airflow and cooling capacity to select zones. The trades involved include, but are not limited to, the following: demolition, sheet metal, HVAC piping, HVAC insulation, geothermal, electrical, temperature controls, and building automation system integration. B. These Special Conditions apply to all Divisions of the Specifications for the above project. Refer to the specifications for specific information. Academic Building Phase: 1. Construction Start: May 13, 2024. 2. Substantial Completion: August 22, 2024. 3. Final Completion: September 22, 2024. Campus Center Phase: 1. Construction Start: December 16, 2024. 2. Substantial Completion: April 15, 2025. 3. Final Completion: May 15, 2025.

Post-Bid

Educational

$400,000.00

Public - State/Provincial

Renovation

9

6

10

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
30
Bidding Soon
487
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 1, 2024

img_map_placeholder

To Be Determined, Owensboro, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.