BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Montrose, Colorado. Conceptual plans call for site work for a road / highway.

Perform supplemental traffic counts (if needed in addition to the already-available data) and develop a Syncro (or similar) traffic model for the 6530/San Juan intersection to be used to ensure the project is justified, for use in project design, and in support of CDOT warrant studies/permitting. This model shall evaluate the intersection with both current and futu Forecast traffic volumes for the intersection area into 2055 assuming an appropriate annual growth rate and accounting for continued development and buildout within areas likely to contribute traffic flow to the intersection. For this evaluation, it can safely be assumed that the Bear Creek and Cimarron Creek subdivisions will be fully built out by 2055. In the absence of traffic data or direction from CDOT to justify a higher value, overall background traffic growth can be assumed at 2% per year. The City reserves the right to accept or reject any or all proposals, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional proposals. The City of Montrose complies with all Equal Opportunity requirements Anticipated Notice of Award: June 4, 2024. Traffic Study Complete: August 1, 2024 CDOT Access Permitting Complete: April 1, 2025 Bid Bonds (5% of total bid price) and performance and payment bonds (100% of total bid price) are required on construction projects over $50,000 Question Deadline 05/07/2024 at 12:00 PM MT All questions regarding this Request for Proposal shall be directed by email Scott Murphy at (970) 901-1792 or email: smurphy@cityofmontrose.org Responses will be prepared by the City in an addendum and published on the City of Montrose web site at: online

Conceptual

Roads / Highways

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
110
All Active Projects
38
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.