EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 28, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

As of June 28, 2024, this project has not yet been awarded. The project is expected to be awarded on July 11, 2024. All Bidders Are Urged to Register to Ensure Receipt of All Necessary Information, Including Bid Addenda. All Bid Addenda Will Be Transmitted to Registered Plan Holders via Email and Will Be Available at H2mplanroom.com. Plan Holders Who Have Paid for Hard Copies of the Bid Documents Will Need to Make the Determination if Hard Copies of the Addenda Are Required for Their Use, and Coordinate Directly With Rev for Hard Copies of Addenda to Be Issued. There Will Be No Charge for Registered Plan Holders to Obtain Hard Copies of the Bid Addenda. Each Proposal Submitted Must Be Accompanied by a Certified Check or Bid Bond, Made Payable to the Garden City Park Water District, in an Amount Not Less Than Five Percent (5%) of the Total Amount of the Bid, as a Commitment by the Bidder That, if Its Bid is Accepted, It Will Enter Into a Contract to Perform the Work and Will Execute Such Further Security as May Be Required for the Faithful Performance of the Contract. The Owner Reserves the Right to Reject Any or All Bids, Waive Any Informalities and to Accept Such Bid Which, in the Opinion of the Owner, is in the Best Interests of the Owner.

Bid Results

Water / Sewer

$1,226,180.00

Public - City

Site Work

10

11

16

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Project Record Documents, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 10 - Specialties

Division 10 - Specialties

Other Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
562
Active Projects
331
Bidding Soon
5,196
All Active Projects
2,386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

Multiple Locations, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Main Replacement on Lipton Lane and West Street H2M Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.