BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Falls of Rough, Kentucky. Working plans call for site work for a water / sewer project.

The Louisville District intends to issue a Solicitation for the Construction of Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project. The contractor shall furnish the equipment, materials, manpower required, and perform the work in accordance with the terms of the contract. The proposed work involves specialized site-specific equipment capable of constructing a new outlet works and excavation and placement of a cutoff wall based on the geology at Rough River Dam. The contractor must have the capability to meet construction deadlines and working in confirmed sites. The ability to ensure continuity of the cutoff wall segments is essential to the success of the project. In order to minimize the technical risk, the contract specifications will include extensive geological and geotechnical engineering data to enable offerors to acquire a thorough understanding of the site conditions. The Contract type is a Firm Fixed Price Contract. The contract award will be based on a best value tradeoff. This is a full and open procurement. This project requires the HubZone 10% price evaluation. All Large businesses shall submit a subcontracting plan. North American industry Classification System (NAICS): 237990 This NAICS code shall be listed on the contractor's "ACTIVE" SAM account prior to submitting a quote. Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. The offeror shall complete the price breakout for the actual solicitation. The total evaluated price will be determined by adding the total of all line items from the price breakout schedule. Award will not be made to offerors who do not provide reasonable and realistic prices for all line items listed in the price breakout schedule. ANTICIPATED "DRAFT" SOLICITATION RELEASE DATE: Mid September. ANTICIPATED "FINAL" SOLICITATION RELEASE DATE: Late November. Point of Contact: The point of contact for this procurement is Contract Specialist Andrew Fleming at Andrew.J.Fleming@usace.army.mil This announcement serves as the advance notice for this project. Responses to this synopsis are not required.

Final Planning

Water / Sewer

$500,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
38
Bidding Soon
610
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

img_map_placeholder

450 Ic-1003, Falls of Rough, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.