BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Oro Grande, California. Completed plans call for site work for a playground / park / athletic field.

SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the removing of current park amenities (picnic tables, trash receptacles, concrete and asphalt, playground equipment and wood chip mulch, clear and grubbing and etc.) and the installation of a new fitness equipment, playground equipment, resurfacing/striping of the basketball court, irrigation, lighting, concrete and asphalt, pathway, landscaping and flatwork as shown on the Bid Documents, including the Plans and Specifications. For information contact Deanna Lestina at (909)386-8825 or email (Deanna.Lestina@dpw.sbcounty.gov). For information regarding this Project, contact the Project Manager, Deanna Lestina at (909)386-8825 or email at (Deanna.Lestina@dpw.sbcounty.gov). DO NOT CONTACT THE DESIGN CONSULTANT. All technical questions may be submitted to the Project Manager in ePro, via e-mail and in writing. Last date to submit questions is May 2nd, 2024 at 10:00 AM. No questions will be answered within 72 hours of the bid opening. PREVAILING WAGES Bidders are hereby notified that this Project is subject to state prevailing wage guidelines. The prime Contractor and all subcontractors are required to pay their laborers and mechanics employed under this Contract, a wage not less than the wage applicable for their work classification, as specified in the wage guidelines. The District has obtained the general prevailing rate of per diem wages in accordance with the law to be paid for the construction of the above Project. The schedules have been obtained from the Director of the California Department of Industrial Relations (DIR), and reference is hereby made to copies thereof on file with the Department of Public Works - Special Districts at 222 Hospitality Lane, 2nd Floor, Street, San Bernardino. CA 92415-0450, which said copies are available to any interested party upon request and included in these bid documents. Further, a copy shall be posted at each job site during the course of construction. Contractor shall be registered with the DIR at time of bid submission and shall indicate its registration number as well as the registration number for all of its subcontractors that will be working on the project. Contractor acknowledges that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. As required by Labor Code section 1771.1(a) "A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded." SCHEDULE Prior to signing the Construction Contract, the Contractor shall submit on a form acceptable to the District and representative of an overall construction schedule for the work. The construction start date will begin when the "Notice to Proceed" is issued and the completion date will be 120 calendar days after the "Notice to Proceed" is issued by the Department of Public Works - Special Districts. TIME LIMITS OF WORK The contract work shall be completed within 120 calendar days after the Notice to Proceed. In case all the work called for under the Contract is not finished or completed within the number of calendar days as set forth in the bid proposal, the Contractor shall forfeit to the District a specified sum of money, to be deducted from any payments due to the Contractor. The sum of money shall be $1,500 per calendar day more than the Contract Time as Liquidated Damages per Section 8.5 of the General Conditions.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,177,604.00

Public - County

Site Work

17

17

9

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
87
Bidding Soon
2,061
All Active Projects
994
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

June 7, 2024

img_map_placeholder

Olive St, Oro Grande, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.