BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Ocala, Florida. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; water / sewer project; and water / sewer project.

BACKGROUND 1. The City of Ocala requires the services of an experienced Contractor to complete the construction of an access road to serve the north side of the Ocala Airport. The roadway is 1,853 feet long, with a 24-foot paved surface, six-foot shoulders, two feet of which are paved. There will be an open ditch on the left side of the roadway for drainage to the treatment pond. The area will be served by public utilities including potable water, gravity sanitary sewer, a sanitary sewer pump station with force main, electrical service (by others), and street lighting (by others). There will be a dry detention pond for stormwater attenuation and water quality treatment with some inlets and Class III RCP. The roadway will be constructed on space owned by the Ocala International Airport. 2. Major Items of Construction are as follows: o Erosion Control o Regular Excavation o Borrow Excavation o 12" Stabilized Subgrade o 8" Limerock Base Course o 2" Superpave Asphalt (SP 12.5) o 8" Concrete o Performance Turf - Seeding o Sanitary Sewer Lift Station o Force Main o Gravity Sanitary Sewer o Potable Water System Bid security equal to five percent (5%) of the total bid amount must accompany each bid. Bid bond will be uploaded in the section of this listing labeled "Bid Bond." The original document will be maintained by the Bidder unless requested to produce by the City Maintenance and Guarantee Bond: The successful Bidder will also be required to furnish a Maintenance and Guarantee Bond for the 10% of the total project value, prior to final payment, for a period of three year(s) for labor and three year(s) for materials from the date of final completion. Payment and Performance Bond: The successful Bidder must submit a recorded Payment and Performance bond in the amount of the total bid. Construction Time: The contract time to Substantial Completion is 240 calendar days. The contract time to Final Completion is 30 calendar days after substantial. Contractor agrees, as a condition for submitting a bid, that this project will be completed in the time agreed upon between the City and the Contractor. The Contractor agrees to commence work on the date specified in a written "Notice to Proceed" by the City. Such "Notice to Proceed" will be issued at the pre-construction conference. The Contractor must be able to mobilize and begin construction no later than 7 calendar days after notification and complete the project by the time limit specified in the "Notice to Proceed." At no time will the Contractor be allowed to lag behind. 23-00114-01

Award

Transportation Terminals

$1,949,000.00

Public - City

Outdoor Lighting, Paving, Site Work

78

15

10

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
141
Bidding Soon
2,114
All Active Projects
828
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2024

July 22, 2024

June 1, 2026

img_map_placeholder

1770 SW 60th Ave, Ocala, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.