BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dover Air Force Base, Delaware. Completed plans call for site work for a water / sewer project.

Estimate: $500,000-1 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Repair B718 a) Design and replace the existing access and safety equipment on exterior oftank to include: a. Exterior shell accessladder with an OSHA compliant ladder complete with standoffs every 10' on center to include a lockable ladder guard and cable type ladder safety device b. Increase roofhatch lip height to at least 4" to comply with the latest AWWA recommendations b) Remove and replace any electrical conduit damaged due to corrosion, c) Remove and replace corrosion protection anodes, d) Sandblast tank exterior, apply one (1) prime coat of polyamide epoxy and one (1) finish coat of polyurethane in accordance with UFGS 09-97-13 40. e) Sandblast all interior areas and apply polyamide epoxy coating in accordance with UFGS 09-97-13 16. f) Repair or replace water level equipment to ensure accurate, measurable water level in tank, g) Provide and install a screen on exit oftank outflow to prevent wildlife intrusion. 1.3.2. Repair B946 a) Design and replace the existing access and safety equipment on exterior oftank to include: a. Exterior shell accessladder with an OSHA compliant ladder complete with standoffs every 10' on center to include a lockable ladder guard and cable type ladder safety device b. Increase roofhatch lip height to at least 4" to comply with the latestAWWA recommendations b) Extend the overflow to grade with same size pipe, complete with standoffs every 10' on center, an elbow fitted with a flapper valve and screen, c) Remove and replace corrosion protection anodes d) Sandblast tank exterior, apply one (1) prime coat of polyamide epoxy and one (1) finish coat of polyurethane in accordance with UFGS 09-97-13 40. e) Sandblast all interior areas and apply polyamide epoxy coating in accordance with UFGS 09-97-13 16. f) Repair tank's fill gauge to ensure accurate, measurable waterlevel in tank.

Post-Bid

Water / Sewer

$1,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
78
Bidding Soon
1,658
All Active Projects
691
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, Dover Air Force Base, DE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.