BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Dover Air Force Base, Delaware. Completed plans call for the renovation of a military facility.

Estimate: $1-5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. REPLACE H706 HVAC BOILER (i) The facility shall remain operational during the performance ofthe entire project. Contractor shall provide a temporary gas-fired boilerto maintain facility operations during swap out of existing boilers. Temporaryboiler capacity shall match heat exchanger requirements, to be verified by contractor, (ii) Demo and remove existing HVAC boilers in mech room of Hangar 706 to include boiler mounting pads and piping to nearestshutoffvalve. Only one boilerto be removed and replaced at a time, as operations in hangar must continue during work, (iii) Design and install two HVAC gas-fired condensing boiler arrays, each consisting oftwo 5000 MBH boilers (total 10000 MBH per array) to include mounting pads. Boilers are to operate in a cascading lead-lag configuration and controls must be compatible with and integrated into the base's Trane BACNet control system in accordance with DoverAFB Installation Facility Standard located at http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs (iv) Provide all plumbing to connect new boiler arrays to existing HVAC heating loops and connect gas linesto new boilers. Plumbing must be installed such that each boiler can be isolated in the event offailure and array will continue operation. Insulate all plumbing in accordance with applicable UFCs/specifications. (v) Test and balance the new boiler system to ensure thatAHUs in the hangar provide required setpoint temperatures and that proper temperature is provided to wash water heat exchanger, (vi) Shop drawings and material submittals for boilers shall be submitted at the same time. Drawings and submittal must be approved by the government priorto mobilization.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
103
Bidding Soon
1,690
All Active Projects
727
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

July 15, 2024

img_map_placeholder

To Be Determined, Dover Air Force Base, DE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.