Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

This is a service / maintenance or supply contract in Miami, Florida. Contact the soliciting agency for additional information.

The work includes the removal and disposal of friable and non-friable materials containing asbestos for the Joseph Caleb Auditorium Front of House Project, as indicated and specified within the reports and the incidental procedures and equipment required to protect workers from contact with airborne asbestos fibers. The Contractor shall obtain all required permits and shall furnish all labor, materials, services, insurance, and equipment required for the removal and disposal of asbestos-containing materials in accordance with the guidelines or regulations of the responsible state agency, the local agency, EPA, and/or OSHA. The work includes, but is not necessarily limited to the following: - All preparation of the work areas and areas outside the work areas prior to beginning asbestos removal work. - Obtain applicable Permitting. - The Contractor shall be required to remove and reconnect fire alarm and voice control panels located inside the administrative office. The fire alarm panel shall be active during demolition. - Removal and disposal of all asbestos materials and waste materials contaminated with asbestos during the process of the work and any other debris generated by this project. Asbestos containing or contaminated material includes but may not be limited to the locations, types and quantities shown in the Bid Form. - Existing conditions to be verified by the contractor. All footage and locations are approximate. See attached asbestos surveys dated January16, 2015, February 24, 2023, and December 14, 2023. - Complete cleaning and decontamination of all work areas and contents thereof. - The selected Contractor will be solely responsible for meeting all Local, State and Federal requirements for the protection of his personnel and the environment during demolition activities. Disposal of hazardous waste is the sole responsibility of the Contractor. Disposal and chain of custody manifests shall be provided to the Owner at the completion of the project.

Post-Bid

Religious / Funeral

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
108
Bidding Soon
1,602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 17, 2024

Project location map

5400 NW 22nd Ave, Miami, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed