BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Miami, Florida. Contact the soliciting agency for additional information.

The work includes the removal and disposal of friable and non-friable materials containing asbestos for the Joseph Caleb Auditorium Front of House Project, as indicated and specified within the reports and the incidental procedures and equipment required to protect workers from contact with airborne asbestos fibers. The Contractor shall obtain all required permits and shall furnish all labor, materials, services, insurance, and equipment required for the removal and disposal of asbestos-containing materials in accordance with the guidelines or regulations of the responsible state agency, the local agency, EPA, and/or OSHA. The work includes, but is not necessarily limited to the following: - All preparation of the work areas and areas outside the work areas prior to beginning asbestos removal work. - Obtain applicable Permitting. - The Contractor shall be required to remove and reconnect fire alarm and voice control panels located inside the administrative office. The fire alarm panel shall be active during demolition. - Removal and disposal of all asbestos materials and waste materials contaminated with asbestos during the process of the work and any other debris generated by this project. Asbestos containing or contaminated material includes but may not be limited to the locations, types and quantities shown in the Bid Form. - Existing conditions to be verified by the contractor. All footage and locations are approximate. See attached asbestos surveys dated January16, 2015, February 24, 2023, and December 14, 2023. - Complete cleaning and decontamination of all work areas and contents thereof. - The selected Contractor will be solely responsible for meeting all Local, State and Federal requirements for the protection of his personnel and the environment during demolition activities. Disposal of hazardous waste is the sole responsibility of the Contractor. Disposal and chain of custody manifests shall be provided to the Owner at the completion of the project.

Post-Bid

Religious / Funeral

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
51
Bidding Soon
1,094
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 17, 2024

img_map_placeholder

5400 NW 22nd Ave, Miami, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.