BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 28, 2024 at 8:00 PM

Updated June 29, 2024

Site work and paving for a civil project in Cartwright Township, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of May 22, 2024, this project has not yet been awarded. The project is expected to be awarded on June 11, 2024. City/County : Sangamon The Work Under This Contract Consists of Steel Beam With Poured Concrete Deck Removal, Earth Excavation, Channel Excavation, Aggregate Base Course, Class a-2 Bituminous Surface Treatment, Precast Prestressed Concrete Deck Beams, Spill Through Abutments, And Associated Roadwork, Erosion Control, and Seeding Necessary to Complete the Project. Project Length is 1,250 Feet (0.237 Mi) Including Realignment of Roadway. Some Quantities Included in the Contract Are: Earth Excavation 3,550 Cu Yd; Aggregate Base Course, Type a, 1,311 Ton; Precast Prestressed Concrete Deck Beams (27" Depth), 1,728 Sq Ft; Reinforcement Bars, Epoxy Coated 4,160 Pound; Steel Railing, Type S1, 128 Ft; Furnishing Steel Piles, Hp 10x42, 240 Foot; Stone Riprap, Class A4 (Special) 220 Ton Plans and Specifications Are Also Available Electronically Through Arlin.williams@sangamonil.gov at No Cost. Project Location: Hergenrother Road (TR 42) over tributary to Richland Creek, approximately 1.11 miles SE of Pleasant Plains, IL. Cartwright Township Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764 ILDOT - 21-05114-01-BR - Steel Beam With Poured Concrete Deck Removal, Earth Excavation, Channel Excavation, Aggregate Base Course

Award

Bridges / Tunnels

$595,006.00

Public - County

Paving, Site Work

30

4

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

September 16, 2024

Project location map

N Hergenrother Rd, Cartwright Township, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.