Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work and paving for a road / highway in Plymouth, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Reconstruct Lowry Avenue NE (CSAH 153) from Johnson Street NE to St. Anthony Boulevard in the Cities of Minneapolis and St. Anthony. Note that the local name changes from Lowry Avenue NE to Kenzie Terrace NE at Stinson Parkway that represents the municipal boundary. Purpose & Description: The existing roadway (last reconstructed in 1968) is nearing the end of its useful life and warrants replacement as routine maintenance activities are no longer cost effective in preserving assets. The segment extending from Johnson Street NE to Stinson Parkway was originally constructed as concrete pavement that has since received bituminous overlays over its concrete surface. These conditions are undesirable as they result in premature cracking in the pavement surface at pre-existing joints. West of Stinson Parkway, the roadway consists of a 2-lane undivided section with off-street parking provided along both sides. Whereas, east of Stinson Parkway, the roadway consists of a 4-lane divided roadway with turn lanes. Throughout the corridor, sidewalk facilities are located immediately adjacent to the roadway, include various obstructions within the walking route, and many pedestrian ramps do not satisfy current design standards. Housing and Economic Development completed the Lowry Avenue NE Framework Plan in 2015 that identified needs in terms of mobiility and development potential. One study theme included a more pedestrian friendly environment along Lowry Avenue NE (CSAH 153). The proposed project is anticipated to include new pavement, curb, storm water utilities, sidewalk facilities, bicycle facilities, ADA accommodations, and traffic signals. It is anticipated that a boulevard will be constructed to provide space for streetscaping elements, separate people walking from people driving, and provide space for signage and snow storage. Green Streets strategies will be explored as part of the project development process, especially for the segment extending from Stinson Parkway to St. Anthony Parkway to promote adequate stormwater management. The proposed project also provides an opportunity to coordinate with the Minneapolis Park and Recreation Board to close a trail gap within the Grand Rounds Regional Trail network located at St. Anthony Boulevard. This project represents Phase 3 (of 3) of capital improvements anticipated for the Lowry Avenue NE (CSAH 153) corridor and is directly related to Capital Project 2140800 and Capital Project 2141000. The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 12, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$11,570,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2030
Multiple Locations, Plymouth, MN
Related To This Project
Plymouth, MN
Bid Date: May 15 2024
Plymouth, MN
Bid Date: May 17 2024
Plymouth, MN
Bid Date: May 08 2024
Plymouth, MN
Bid Date: May 15 2024
Plymouth, MN
Bid Date: Jun 07 2024
Plymouth, MN
Bid Date: Jun 07 2024
Plymouth, MN
--
Plymouth, MN
--
Plymouth, MN
Bid Date: Apr 25 2024
Plymouth, MN
Bid Date: Apr 09 2024
Plymouth, MN
Bid Date: Apr 09 2024
Plymouth, MN
Bid Date: Apr 09 2024
Plymouth, MN
Bid Date: Apr 09 2024
Plymouth, MN
Bid Date: Apr 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
