Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a sidewalk / parking lot in San Antonio, Texas. Completed plans call for the construction of a sidewalk / parking lot; and for site work for a sidewalk / parking lot.
Companies wishing to respond to this solicitation must download the Collective Document from this website. The Collective Document contains important information regarding responses to this bid opportunity. CPS Energy is seeking a Company to provide Facilities Design-Build Services for a New CPS Energy Service Center for an anticipated term of three (3) years. Company shall provide CPS Energy Design-Build Services for a New CPS Energy Service Center. The scope of Services includes building design, parking, landscaping, building surrounds, furniture fixtures and equipment for Facilities. Ask questions by 4/26/2024 5:00 pm All questions regarding this procurement must be submitted in writing, either through this portal, or to the Procurement Agent via email at jsierra@cpsenergy.com. CPS Energy requires facilities of approximately 97,000 gross square feet, have a projected useful life of at least forty years, and a laydown yard of approximately 120,000 gross square feet and required parking. All solutions must deliver a turn-key facility including the office environment. CPS Energy seeks to create a more efficient and effective space for its field offices, service units, and support units, which currently reside and function in various locations with sub-optimal operating conditions. CPS Energy's desires to utilize industry best practices related to warehouse and service-center spaces to improve customer service, daily operations, emergency operations, overall productivity, organizational effectiveness, as well as employee satisfaction and retention. The Projectshould incorporate elements of a modern, high-quality service center as outlined herein and include elements such as make ready for future solar panels needs for the facility, wireless technologies, 50 ft. x 50 ft. column spacing, minimum 24' clear height, office space, rainwater collection system for irrigation, sustainable construction, and "Build San Antonio Green" compliance. Additionally, the building must be designed and constructed for flexible uses and long-term durability as well as future on-site expansion. An emphasis on native, long-lasting building materials and environmentally sensitive construction elements are strongly preferred by CPS Energy. The Project budget is estimated to be no more than $83 Million. If the guaranteed maximum price contained in a Proposal (as defined below) received during the RFP phase exceeds the Project budget, CPS Energy may, in its sole discretion, reject such Proposal. CPS Energy expects the proposed guaranteed maximum price reflected in a Proposal to be less than the Project budget. The new Service Center will be built on a CPS Energy-owned site located at 12520 West Highway 90, San Antonio, Bexar County, Texas 78227 (29.371619087806994, -98.74192356793968). The development site is approximately 25 acres and is situated southwest of the intersection of US Highway 90 West and W.T. Montgomery. Pre-Bid Meeting- Phone conference ID: 387 492 0# Join on a video conferencing device Tenant key: cpsenergy@m.webex.com Video ID: 115 103 532 3
Post-Bid
Sidewalks / Parking Lot
$4,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2024
January 22, 2025
12520 US-90, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
Bid Date: Apr 30 2024
San Antonio, TX
Bid Date: Jun 04 2024
San Antonio, TX
Bid Date: Apr 30 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: May 23 2024
San Antonio, TX
Bid Date: Nov 19 2024
San Antonio, TX
Bid Date: Aug 30 2024
San Antonio, TX
Bid Date: Apr 22 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: May 16 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.