Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Fargo, North Dakota. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Project work consists of but is not limited to the following: The 2024 Airfield Pavement Marking project will consist of airfield pavement marking removal and new pavement markings All work for this project shall be completed by August 30, 2024. Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner’s Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities.
Bid Results
Transportation Terminals
$432,320.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
June 3, 2024
2801 32nd Ave N, Fargo, ND
Related To This Project
Fargo, ND
Bid Date: May 08 2024
Fargo, ND
Bid Date: May 03 2024
Fargo, ND
Bid Date: May 07 2024
Fargo, ND
--
Fargo, ND
--
Fargo, ND
Bid Date: May 09 2024
Fargo, ND
Bid Date: May 23 2024
Fargo, ND
Bid Date: May 08 2024
Fargo, ND
Bid Date: May 08 2024
Fargo, ND
Bid Date: Nov 01 2024
Fargo, ND
Bid Date: May 02 2024
Fargo, ND
Bid Date: May 08 2024
Fargo, ND
Bid Date: May 08 2024
Fargo, ND
Bid Date: May 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.