BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a fire / police facility in Apple Valley, Minnesota. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

City of Apple Valley Central Maintenance Facility (CMF) & Police Department Bid Package #3 6442 140 Street West Apple Valley, MN 55124 The project work scope consists of a renovation and expansion of the Central Maintenance Facility, new Fleet Maintenance Building, and a new Police Operations Building. Bid Package No. 3 is specific to the Police Operations Building located at the South end of the property, and is to include 6D Casework Materials, 8F Aluminum Framed Storefronts & Entrances, and 26D Electrical Communications, Safety & Security. For a detailed breakdown of bid categories, please reference specification section 01-11-50 Work Sequences and Bid Categories. A bid security in the amount of 5% of the base bid will be required to accompany bids. Bids received after that time will not be accepted and will be returned unopened. Envelopes containing bids must be sealed, marked City of Apple Valley Central Maintenance Facility & Police Operations Building and the Bid Category No. being bid with attention to Matt Saam - Public Works Director. The name and address of the Bidder must be shown on the outside of the envelope. The date and time of the bid is to be noted on the label. Bids received after this time will not be accepted and will be returned unopened. Make Bids in duplicate in exact accordance with the proposal form in the Project Manual, and sign in long-hand. No oral, telegraphic or fax bids will be accepted or considered. Combined bids including multiple bid categories will be accepted. However, in order to be considered, bidders must also submit separate individual bids in addition to the combined bid. Combined bids will not be accepted if individual bids are not submitted. Each separate bid or combined bid must appear alone on a bid form and submitted in separate envelopes. Submit with each bid a certified check, bank money order or acceptable bidders bond issued by a surety meeting city requirements payable to the City of Apple Valley in the amount equal to five percent (5%) of the total bid. For requirements, please reference specification section 00 21 00 - Supplementary Instructions to Bidders. All bids will be evaluated by the Owner, the Architect, and the Construction Manager. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids and waive informalities or irregularities in bidding. Successful bidders will be required to furnish satisfactory Labor and Material Payment Bond, Performance Bond, and Certificates of Insurance and a signed contract within 10 days of award of contract. No bidder may withdraw his/her bid for at least 90 days after the scheduled bid opening. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes Section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The schedule for the Police Department portion of the project is to commence work in early summer 2024 with substantial completion scheduled for spring 2025. Work will be completed according to the preliminary project construction schedule issued in the Bid Documents. Please direct all inquiries to Simon Midtbo, RJM Construction at 612-513-4201. Est. Completion Date: April 15, 2025

Post-Bid

Fire / Police

$1,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
68
Bidding Soon
1,671
All Active Projects
577
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 30, 2024

May 30, 2024

April 15, 2025

img_map_placeholder

6442 140th St W, Apple Valley, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.