BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2025 at 7:00 PM

Updated February 8, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Poughkeepsie, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

RFB-COP-02-24-03, 8761.96, LD036275 Reference Number 0000371329 The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Bridge replacement with concrete abutments, prestressed concrete hollow slab units, and concrete deck on a new vertical alignment upstream and downstream of the current bridge. Question Deadline 01/15/2025 The Owner is the City of Poughkeepsie and the work site is located in the City of Poughkeepsie. The projects limits extend from: Approx. 470 feet along Garden Street in the vicinity of the Garden Street Bridge crossing the Fallkill Creek. Approx. 120 feet along Brookside Ave at the intersection of Brookside Ave with Garden Street. The Washington Street Bridge reconstruction limits extend 590 feet along Washington Street in the vicinity of the Washington Street Bridge crossing the Fallkill Creek, extending approx. 240 feet along Brookside Ave, 220 feet along Verazzano Blvd, and 180 feet along N. Bridge St at their intersections with Washington Street. Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required he DBE goal for this project is: 6% There are no M/WBE goals for this project. The EEO Employment goals for this project are: 6.4 % Minority Employment Goal 6.9% Women Employment Goal Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % -- Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The Work will be substantially completed within 988 calendar days from the Notice to Proceed and completed and ready for final payment on September 30th, 2027

Post-Bid

Bridges / Tunnels

$3,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

156

17

49

4

Subscribe For Documents

132 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
868
Active Projects
445
Bidding Soon
6,860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

April 4, 2025

Project location map

153 Garden St, Poughkeepsie, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.