Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Burbank, California. Completed plans call for the renovation of a educational facility.
Bidders not attending the conference will be disqualified. Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid(s) and made payable to the Owner. If a bid bond is used, it must be issued by an Admitted Surety (an insurance organization authorized by the Insurance Commissioner to transact surety insurance in the State of California during this calendar year), which shall be given as a guarantee that the bidder will enter into a Contract if awarded the Work and will be declared forfeited, paid to, or retained by the Owner as liquidated damages if the bidder refuses or neglects to enter into the Contract provided by the Owner after being requested to do so. The surety insurer must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bond, have a rating not lower than "A-" as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurer selected by Contractor and to require Contractor to obtain a bond from a surety insurer satisfactory to the Owner. When award is made to the successful bidder, it shall submit a certification if required by Public Contract Code section 3006(b). Pursuant to Public Contract Code Section 20103.8 (d) the lowest bid shall be determined in a manner that prevents any information that would identify any of the bidders or proposed subcontractors or suppliers from being revealed to the public entity before the ranking of all bidders from lowest to highest has been determined. If the Owner awards the contract within 5 or less working days after the bid opening, the low bidder would not have the full 5 working days to withdraw its bid under Public Contract Code section 5103. By submitting a bid, all bidders acknowledge this potential shortened time to withdraw its bid and waive all rights to the full 5-day statutory period. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, said bonds to be secured from Admitted Surety insurers (an insurance organization authorized by the Insurance Commissioner to transact business of insurance in the State of California during this calendar year). The surety insurers must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bonds, have a rating not lower than "A-" as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurers selected by the successful bidder and to require the successful bidder to obtain bonds from surety insurers satisfactory to the Owner. The bidder will be required to furnish insurance as set forth in the Contract Documents. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class "C-33" license and shall maintain that license in good standing through Project completion and all applicable warranty periods. Bidder shall list all subcontractors doing more than one-half of one percent (0.5%) of the bidder's total bid on the Designation of Subcontractors form; all listed subcontractors shall have valid and current licenses at the time of the bid; and bidder shall state such license number on such form. Subcontractors shall maintain their licenses in good standing through Project completion and all applicable warranty periods. Owner reserves the right to reject any bid if bidder is not licensed in good standing at the time of the bid or anytime thereafter, or if a listed subcontractor is not licensed in good standing at the time of the bid or anytime thereafter to do the work for which it is listed. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Copies of the required rates are on file at the Owner's business office and are available to any interested party on request. Projects using state bond funds are subject to labor compliance monitoring and investigative activities by the Compliance Monitoring Unit ("CMU") of the Division of Labor Standards Enforcement, Department of Industrial Relations of the State of California ("DIR"), in conformance with Labor Code sections 1771.55 and 1771.75, and subchapter 4.5 (commencing with section 16450) of title 8 of the California Code of Regulations. A pre-job conference shall be held with the Contractor and Subcontractors to discuss federal and state labor law requirements applicable to the Project. The Contractor and Subcontractors shall furnish certified payroll reports to CMU on a weekly basis, using either the format prescribed by section 16401 of title 8 of the California Code of Regulations, or using CMU's electronic certified reporting system ("eCPR"). CMU may require the Contractor and Subcontractors to furnish certified payroll reports to CMU using eCPR. CMU shall review, and may confirm or audit payroll records to verify compliance with Chapter 1, Part 7 of Division 2 of the California Labor Code. CMU may also conduct on-site visits to each Project job site at its discretion. Contractor shall display a mandatory poster at the Project job site as described by 16451, subd. (d), of title 8 of the California Code of Regulations. Owner shall withhold contract payments when CMU issues Owner a notice to withhold such payments upon a finding by CMU that payroll records are delinquent or inadequate. In addition to withholding contract payments based on delinquent or inadequate payroll records, penalties may be assessed for failure to timely comply with a written request for certified payroll records. Further, upon a finding by CMU that Contractor is liable for unpaid wages or penalties, the Labor Commissioner may issue and serve a Civil Wage and Penalty Assessment. The Owner reserves the right to waive any irregularity and to reject any or all bids. Unless otherwise required by law, no bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening thereof or any authorized postponement thereof. The Owner reserves the right to take more than sixty (60) days to make a decision regarding the rejection of bids or the award of the Contract. Dennis Maxwell, Director of Facilities By Authority of the Governing Board of Burbank Unified School District Burbank, County of Los Angeles, State of California
Award
Educational
$356,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
June 3, 2024
1920 W Clark Ave, Burbank, CA
Related To This Project
Burbank, CA
Bid Date: May 21 2024
Burbank, CA
Bid Date: Jun 04 2024
Burbank, CA
Bid Date: Jun 11 2024
Burbank, CA
Bid Date: May 20 2024
Burbank, CA
Bid Date: Jun 05 2024
Burbank, CA
Bid Date: Jun 04 2024
Burbank, CA
Bid Date: Jun 06 2024
Burbank, CA
Bid Date: Jun 17 2024
Burbank, CA
Bid Date: May 01 2024
Burbank, CA
Bid Date: May 13 2024
Burbank, CA
--
Burbank, CA
Bid Date: Apr 08 2024
Burbank, CA
Bid Date: Apr 16 2024
Burbank, CA
Bid Date: May 01 2024
Burbank, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.